Confined space entry & hot work permits
Some construction work is too dangerous to start on a verbal "looks fine" — it needs a written permit that proves the hazard was checked and controlled first. On a construction site OSHA requires one for permit-required confined-space entry (29 CFR 1926 Subpart AA); hot work under 1926.352 has fire-prevention rules but no permit requirement, and many sites put it on a permit anyway. This hub covers when each permit is required, the atmospheric testing, the roles, the rescue plan, and the fire watch — with the exact CFR paragraph for each.
Verified against osha.gov · July 21, 2026
At a glance
What's a permit space
A confined space (big enough to enter, limited entry/exit, not for continuous occupancy) that has or could have a hazardous atmosphere, engulfment, an entrapment configuration, or any other serious hazard
1926.1202The written permit
Identify and evaluate the space's hazards before entry, and run a system to prepare, issue, use, and cancel entry permits — no entry on a verbal OK
1926.1204(b), (j)Test the air
Test before entry, in the order oxygen → combustible gases → toxic gases, for the hazards the space can hold; monitor continuously during entry, or periodically where 1926.1204(e)(2) allows
1926.1204(e)Three roles
An entry supervisor authorizes and can terminate entry; an attendant stays outside until relieved; authorized entrants do the work and exit on command
1926.1204(h)Rescue
Provide for summoning rescue and for rescuing entrants — a non-entry retrieval system or a rescue service; self-rescue alone is not a compliant PRCS rescue plan
1926.1204(i); 1926.1211Hot work
Welding, cutting, grinding and other heat/spark work needs a fire watch when normal fire-prevention precautions are not sufficient. 1926.352 requires no written permit; many sites use one anyway
1926.352(e)The permit essentials, verified against 29 CFR 1926 Subpart AA and the hot-work standard. A single unsafe entry rarely draws just one citation — a missing permit, un-tested air, no attendant, and no rescue plan each cite separately, up to $16,550 per serious violation.
Check the four pre-entry gas readings
Enter the four pre-entry gas readings for a permit-required confined space. Each is checked against the tool's limit. The check covers these four gases only: other toxic vapors, combustible dust and the space's other hazards need their own tests and controls before anyone enters (1926.1202, 1926.1204). Runs on the same engine as our Confined Space Permit Generator.
1926.1202: 19.5-23.5%
1926.1202: <10% of LFL
4-gas alarm setpoint, below the 50 ppm construction PEL (1926.55 Table 1)
Alarm trigger set at the 10 ppm construction PEL (1926.55 Table 1, 8-hour TWA; NIOSH: 10 ppm ceiling over 10 minutes). An instant reading does not measure either average.
Test from outside the space first, in this order — oxygen, then combustible gases, then toxics (1926.1204(e)(3)). CO and H₂S are the usual toxics, not the only ones: test for whatever the space can hold. Monitor continuously during entry, or periodically where 1926.1204(e)(2) allows it.
Enter the four pre-entry gas readings to check them against the tool's limits. The check covers these four gases only.
When a permit is required
OSHA requires a written permit for permit-required confined-space entry. Hot work has fire-prevention rules in construction but no permit requirement; many sites, owners and insurers use one anyway.
Permit-required confined space
A confined space is one big enough to enter, with limited entry/exit, not designed for continuous occupancy. It becomes permit-required when it has or could have a hazardous atmosphere, engulfment potential, an entrapment configuration, or any other serious hazard.
1926.1202 · Subpart AAHot work
Welding, cutting, grinding, brazing, and other heat- or spark-producing work needs the fire-prevention measures of 1926.352, and a fire watch when normal precautions are not sufficient. 1926.352 requires no written permit; a hot-work permit is a site, owner or insurer choice.
29 CFR 1926.352The three roles
A permit-required entry needs three named people. The one detail that costs lives: the attendant stays out.
Entry supervisor
Authorizes entry, verifies the permit and acceptable conditions, and terminates entry when conditions change. Signs the permit before anyone goes in.
1926.1210Attendant
Stays OUTSIDE the space while on duty, monitors the entrants and the atmosphere, keeps continuous communication, and initiates rescue. Only once relieved by another attendant may they enter to rescue, and only if the program allows it and they are trained and equipped (note to 1926.1209(d)).
1926.1209Authorized entrant
Does the work inside, knows the hazards and the symptoms of exposure, keeps in contact with the attendant, and exits immediately when told or when an alarm sounds.
1926.1208Testing the atmosphere
Test from outside the space, in a fixed order, before entry, for the hazards the space can hold. Keep monitoring while anyone is inside: continuously, unless 1926.1204(e)(2) allows periodic checks. A blank reading is not a pass: you can’t authorize entry on air you didn’t test.
| Test (in order) | Tool limit | Basis |
|---|---|---|
| 1. Oxygen (O₂) | 19.5–23.5% | 1926.1202: 19.5-23.5% |
| 2. Combustible Gas (LEL) | < 10% LEL | 1926.1202: <10% of LFL |
| 3. Carbon Monoxide (CO) | < 25 ppm | 4-gas alarm setpoint, below the 50 ppm construction PEL (1926.55 Table 1) |
| 4. Hydrogen Sulfide (H₂S) | < 10 ppm | Alarm trigger set at the 10 ppm construction PEL (1926.55 Table 1, 8-hour TWA; NIOSH: 10 ppm ceiling over 10 minutes). An instant reading does not measure either average. |
The tool stops at 10 ppm H₂S, the construction PEL (29 CFR 1926.55 Table 1, an 8-hour average; NIOSH sets 10 ppm as a ceiling over 10 minutes). An instant reading measures neither average, so treat 10 ppm as an alarm trigger. The 20 ppm ceiling belongs to Table Z-2, general industry, which does not govern construction work. CO alarms at 25 ppm, below the 50 ppm construction PEL. Oxygen and combustible ranges are the 1926.1202 hazardous-atmosphere definitions. These four gases are what a 4-gas meter reads, not a list OSHA sets: test for any other substance the space can hold.
Rescue — planned before entry, not during
The rescue duty
Before entry, you must provide for summoning rescue and for rescuing entrants — a non-entry retrieval system (tripod and winch) or a trained rescue service on call. More than 60% of the confined-space deaths NIOSH reviewed were would-be rescuers (NIOSH Alert 86-110, 1986).
1926.1204(i); 1926.1211Self-rescue is not a plan
“The entrant will climb out” is not a compliant rescue plan for a permit-required space. And the attendant stays out while on duty and summons rescue; a relieved attendant may enter only if the program allows it and they are trained and equipped (note to 1926.1209(d)). Non-entry retrieval is the default because it protects the would-be rescuer (1926.1211(c)).
1926.1211Hot work & the fire watch
Construction fire prevention for welding, cutting, grinding, and other heat/spark work is 29 CFR 1926.352. A fire watch is required when the work is such that normal fire-prevention precautions are not sufficient, kept during the work and long enough after it that no fire can start (1926.352(e)).
A note on the familiar numbers. The 35-foot combustible-clearance rule comes from NFPA 51B and from the general-industry rule (1910.252(a)(2)(vii)) — not from any number in 1926.352. The fire-watch duration is where most guidance goes wrong: NFPA 51B sets a minimum of 60 minutes, and has since its 2019 edition. The 30 minutes quoted everywhere is OSHA general industry (1910.252(a)(2)(iii)(B)), which does not reach construction work — and 1926.352(e) fixes no duration at all, requiring instead a sufficient period to ensure that no possibility of fire exists.
Hot work inside a permit space needs the entry permit, which lists the space's hazards and any hot-work permit issued for the job (1926.1206(h), (p)). A separate hot-work permit is your site's choice in construction, not a 1926.352 requirement. HazComFast builds each, keeps the fire-watch and atmospheric records, and stores the signed permit so the job is defensible.
Permits that follow the rule, from issue to close
Confined-space permits carry the entries the standard names, hot-work permits carry the fire-prevention checks of 1926.352 for the sites that use one, and each refuses to move on when a check is missing.
No reading, no "Safe"
A reading with only oxygen never shows "Safe": the screen says the space was not tested and must not be entered, and the permit can't be issued. An out-of-limits reading on an active permit suspends it and alerts the supervisor and the attendant.
Real end times
Permits expire at their real end time, in the jobsite's time zone, and the supervisor gets a notice that opens the permit. An expired permit stays expired.
Revisions you can follow
Change a live permit and you get Revision #1, with the reason, the old and new value, who and when. The original never disappears.
The PDF in the rule's order
Close a permit and its PDF is archived as it is: every 1910.146(f) item in order, or the 16 items of 1926.1206, the supervisor's name and signature, each reading with who took it, and a QR code back to the live permit.
Flammables on site
Before a hot-work permit is issued, it checks the jobsite's chemical list and warns you about flammables declared on site.
Competent persons in date
A confined-space permit can't be issued under a competent person whose designation has lapsed. The system refuses and says since when.

Key facts
- A confined space is only 'permit-required' when it carries a real hazard — a hazardous atmosphere, engulfment risk, an entrapment configuration, or another serious hazard (1926.1202).
- Test from outside first, in order — oxygen, then combustibles, then toxics — and monitor continuously during entry, or periodically where continuous equipment isn't available or periodic checks keep conditions safe (1926.1204(e)(2)/(3)).
- Acceptable oxygen is 19.5–23.5%; combustible gas must be below 10% of its lower flammable limit (1926.1202).
- The attendant stays outside while on duty and summons rescue. Only once relieved by another attendant may they enter to rescue, and only if the program allows it and they are trained and equipped (1926.1209(d) and its note, 1926.1211).
- Construction confined spaces are governed by 1926 Subpart AA, the general-industry standard 1910.146 does not apply to construction.
- In construction, hot work needs a fire watch when normal fire-prevention precautions are not sufficient, during the work and long enough after it that no fire can start (1926.352(e)). The familiar 35-ft clearance and 30–60-minute post-work watch are NFPA 51B recognized practice, not literal CFR text.
Tools, guides and the standard
Free tools
- Confined Space Permit Generator
Build the bilingual entry permit with the atmospheric readings and roles.
- Hot Work Permit Generator
Document the fire watch, clearance, and sign-offs for heat/spark work.
- Toolbox Talk Generator
Brief the crew on the entry or hot-work hazards before the shift.
In-depth guides
- Confined space entry: the permit-required guide
- Who dies in confined spaces: 1,030 deaths & the rescuer trap
- Hot work permit & fire watch (1926.352 vs NFPA 51B)
- Why hot work keeps killing: 15 CSB investigations & the OSHA rules
- Construction Subpart AA vs general-industry 1910.146
- Confined space training by role
- Is exactly 10% LEL safe to enter?
- Digital permits for hot work & confined space
Safety permits FAQ
What defines a confined space under OSHA?
A confined space must meet ALL three criteria: (1) large enough and so configured that an employee can bodily enter it (the general-industry rule, 1910.146(b), adds 'and perform assigned work'; the construction rule, 1926.1202, does not), (2) has limited or restricted means for entry and exit, and (3) is not designed for continuous employee occupancy. Examples include tanks, vessels, silos, storage bins, hoppers, vaults, pits, manholes, and some crawl spaces; in construction, tunnels and shafts under construction fall under Subpart S instead (1926.1201(b)(2)).
What makes a confined space 'permit-required'?
A confined space becomes permit-required (PRCS) if it contains or has the potential to contain: a hazardous atmosphere, material that could engulf the entrant, an internal configuration that could trap or asphyxiate (converging walls, sloped floors), or any other recognized serious safety or health hazard. For construction work this is governed by 29 CFR 1926.1202 (1926 Subpart AA — Confined Spaces in Construction); 1910.146 is the general-industry analog and does not apply to construction.
What atmospheric readings are required before entry?
Test the atmosphere BEFORE entry in this order: (1) Oxygen (O₂): 19.5–23.5% is acceptable, (2) Flammable gases (LEL): must be below 10% of its LFL, (3) Toxic gases. For H₂S the tool stops entry at 10 ppm. That is the construction PEL, 29 CFR 1926.55 Table 1, an 8-hour average, and NIOSH's REL is a 10 ppm ceiling averaged over 10 minutes. An instant pre-entry reading measures neither average, so 10 ppm works as an alarm trigger, not as proof that either limit is met. The 20 ppm ceiling you may have seen is Table Z-2, general industry, and does not govern construction work. For CO the tool alarms at 25 ppm, deliberately below the 50 ppm construction PEL. For construction, the atmosphere is monitored continuously during entry, or periodically where continuous equipment isn't commercially available or periodic checks are frequent enough to keep conditions safe (29 CFR 1926.1204(e)(2)). CO and H₂S are the usual toxics. A 4-gas meter does not read solvent vapors, ammonia, chlorine or combustible dust, all of which can make a hazardous atmosphere under 29 CFR 1926.1202: test for any the space can hold, with an instrument that reads them. Test from outside the space first using extension probes.
Who are the key roles for a confined space entry?
Three roles are required: (1) Entry Supervisor: authorizes entry, verifies conditions, terminates entry. (2) Attendant: remains outside until relieved, monitors entrants, maintains communication, initiates rescue. A relieved attendant may enter to rescue only if the program allows it and they are trained and equipped (note to 1926.1209(d)). (3) Authorized Entrant: enters the space, must know hazards, communicate with attendant, exit immediately upon order.
Do I need a separate permit for hot work?
In construction, OSHA doesn't require one. Construction fire prevention for welding, cutting, grinding, and other heat- or spark-producing work is 29 CFR 1926.352, and a fire watch is required when normal fire-prevention precautions are not sufficient (29 CFR 1926.352(e)). 1926.352 does not require a written permit; many employers, insurers and owners require one anyway. The common 35-foot combustible clearance comes from NFPA 51B and the general-industry rule (1910.252(a)(2)(vii)), whose baseline post-work fire watch is an hour and has been since its 2019 edition (the 2024 edition adds a provision that allows a reduction). The 30 minutes often quoted alongside it is OSHA general industry, 1910.252(a)(2)(iii), and does not reach construction work; 1926.352(e) fixes no duration at all.
What are the OSHA penalties for a confined-space or hot-work violation?
Confined-space and hot-work requirements are cited like any other construction standard: up to $16,550 per serious violation and $165,514 per willful or repeated violation at 2026 amounts (29 CFR 1903.15(d)). Because an entry can involve multiple missing controls — no permit, no atmospheric testing, no attendant, no rescue plan — a single unsafe entry often draws several citations at once.
Sources
- osha.gov/laws-regs/regulations/standardnumber/1926/1926.1204
- osha.gov/laws-regs/regulations/standardnumber/1926/1926.1202
- osha.gov/laws-regs/regulations/standardnumber/1926/1926.352
Confined-space program, permit, atmospheric-testing order, roles, and rescue duties per 29 CFR 1926.1202/1204/1211 verified against osha.gov on July 21, 2026. Hot-work fire-watch duty per 1926.352(e); the 35-ft/30–60-min figures are NFPA 51B recognized practice, not CFR text. General guidance, not legal advice; State-Plan states may impose additional requirements.
Get the Binder in Order Before the Inspector Arrives. Are You Ready?
OSHA inspections come unannounced, apart from the few exceptions listed in 29 CFR 1903.6. Get the binder in order before the opening conference, not during it.
Serious Violation
$16,550
per violation (max)
HazComFast Pro
$199/mo
10 jobsites, unlimited chemicals, unlimited workers
New sign-ups are paused. The free tools below need no account, and customers can log in as usual.
Your account keeps working as usual. Cancel anytime.