Skip to content

Approaching: Feb 1, 2027 — 300A Posting Begins. Get ready →

Built for Construction

Construction HazCom Software for jobsites, not cubicles

Multi-employer SDS coordination, jobsite SDS on the phone before the signal drops, subcontractor portals, and audit-ready records—all from a phone. Built for OSHA 1926.59 HazCom.

Full feature access · Cancel anytime · View pricing

$16,550

per serious violation

2026 maximum (unchanged from 2025)

#2

most-cited standard

HazCom 1910.1200

$165,514

per willful or repeat violation

2026 maximum (unchanged from 2025)

Built for every trade

Whether you're a GC managing 20 trades or a solo electrical sub, HazComFast fits your workflow.

General Contractors

Multi-employer coordination, sub portals, centralized SDS

Electrical & Mechanical Subs

Solvents, adhesives, cleaners — all need SDS and labels

HVAC & Plumbing Contractors

Refrigerants, pipe solvents, flux — chemicals on every job

Painting & Coatings Subs

VOCs, isocyanates, strippers — high-hazard chemicals

Concrete & Masonry

Silica dust, admixtures, form release agents

Safety Directors

Audit-ready records across all trades and jobsites

Sound familiar?

Construction HazCom is harder than general industry. Multi-employer worksites, transient crews, and harsh conditions make compliance a daily challenge.

  • Multi-employer jobsite—who owns the SDS binder? Everyone points fingers until the inspector writes the citation.
  • Subs show up with chemicals you've never heard of. No SDS, no labels, no training records.
  • Paper binder locked in the trailer while the crew is on the 14th floor. OSHA says 'readily accessible'—that's not it.
  • Inspector asks for your written HazCom program. You have one… somewhere. Maybe from 2019.
  • Language barrier: much of your crew may speak only Spanish. Provide training workers understand. The HCS requires SDSs in English and permits additional languages (1910.1200(g)(2)).

How HazComFast works on the jobsite

Four steps, from the first jobsite to the crew's phones.

1. Upload your SDS library

Drag-and-drop SDS PDFs or pull from our 30,000+ chemical database. Auto-indexed by product name, manufacturer, and CAS number.

2. Invite subs via link

Generate a guest link per jobsite. Subcontractors view SDS without an account—no app install, no login. You get a read-confirmation audit trail.

3. Built for low-signal jobsites

Your jobsite's SDS load onto the phone on their own, and the app shows how many are ready (17 of 20, 20 of 20) before the crew heads into a basement or tunnel. A QR code on each container opens its SDS in a browser, with no app and no account.

4. Records on the phone

When the inspector is on site, pull up the written HazCom program, training logs and SDS records on the phone.

One company plan, one plan for each jobsite

On a construction site the emergency action plan comes from 29 CFR 1926.35 and the portable fire extinguishers from 1926.150. HazComFast keeps both for each jobsite.

Set the company to 1910, 1926 or both

A construction emergency plan prints 29 CFR 1926.35, not the general-industry rule. A company that does both kinds of work keeps one plan for each.

Write the company plan once

Each jobsite gets its own plan from it, with its own exits, assembly point and wardens. When you update the company plan, each site sees what changed, section by section, and nothing in the site plan is overwritten.

The site's plan on every phone

A worker's emergency screen shows the plan for the site they're on, with one tap to call the site lead.

Extinguishers counted against 1926.150

Enter a site's floor area and number of floors and see how many extinguishers rated at least 2A 29 CFR 1926.150(c)(1) calls for, against the ones recorded on site.

HazComFast Emergency Action Plan, Version 4, ACTIVE, under Construction (29 CFR 1926): the scope paragraph quoted from 29 CFR 1926.35(a), last management review Sep 27, 2026, next review Sep 27, 2027 labeled Internal policy, not an OSHA requirement, and 1/3 employees acknowledged reading v4
The plan names the construction rule it's written under, and the next review is labeled as your own policy.
HazComFast notice on a jobsite plan: The company plan changed since this site plan was last compared with it. Nothing in this site plan was overwritten. The Alarm System section side by side, company plan now and this site's plan, with a button to use the company text for this section and a button to mark the comparison as done
The company plan changed. The site plan shows what's different, section by section, and keeps its own text until someone chooses.

Why construction companies choose HazComFast

Purpose-built for the realities of construction—not a general-industry tool with a hard hat icon.

  • Built to 29 CFR 1926.59 — the construction route into HazCom
  • Multi-employer citation defense: prove you trained, communicated, and documented
  • Your jobsite's SDS on the phone, with a count of how many are ready before you go underground
  • QR codes on containers—workers scan to view SDS, you get an audit trail
  • Subcontractor SDS portal: subs upload their own chemicals, you verify
  • GHS label generator for secondary containers—print from your phone
  • Toolbox talk generator with sign-in sheet—done in 2 minutes
  • Spanish language support for SDS access and training records

On a shared jobsite, more than one employer can be cited

OSHA's Multi-Employer Citation Policy (OSHA Directive CPL 02-00-124, in effect since December 10, 1999) can cite the employer that created a hazard, the one whose crew is exposed, the one hired to correct it and the general contractor in control of the site, when each fell short of what its role requires. Every employer that brings chemicals onto the site also owes the others its SDS access, precautions and labeling system under 29 CFR 1910.1200(e)(2).

Who OSHA can cite on a multi-employer worksite, and how a GC proves reasonable care →

Primary sources

Every citation on this page is drawn from the regulation and enforcement policy itself — verify each one:

Penalty amounts reflect the 2026 federal maximums. CFR citations last verified 2026-10-05. See also the HazCom glossary and OSHA standards library.

FAQ

Construction HazCom FAQ

Yes. OSHA 29 CFR 1926.59 extends HazCom to construction. Construction employers must have a written program, SDSs readily accessible, GHS-compliant labels, and employee training—just like general industry under 1910.1200.

29 CFR 1910.1200(e)(2), which applies to construction through 29 CFR 1926.59, puts the duty on the employer who brings the chemical on site: its written program must say how it gives the other employers access to the SDSs, tells them the precautions to take, and tells them the labeling system it uses. Separately, OSHA's Multi-Employer Citation Policy (CPL 02-00-124) can cite a General Contractor as a controlling employer when it fails to exercise reasonable care to prevent and detect violations.

Construction sites have dead zones: basements, tunnels, concrete cores, remote sites. OSHA requires SDS to be readily accessible during each work shift, and a sheet that won't load because there's no signal is not accessible. HazComFast loads your jobsite's SDS onto the phone on their own and shows how many are ready before the crew heads underground. First-aid steps for every product on the jobsite stay on the phone, even in airplane mode.

Yes. Any employer whose workers handle hazardous chemicals must comply with OSHA 1910.1200 (or 1926.59 for construction). Contractors bringing solvents, adhesives, cleaners, or other chemicals onsite need SDS access, labels, and training.

Serious violations: up to $16,550 per violation. Willful or repeated: up to $165,514 per violation. Failure to abate: $16,550 per day. These are the 2026 maximums, unchanged from 2025 (no inflation increase). Citing instances separately is a discretionary exception, not the default: OSHA's instance-by-instance policy of April 17, 2024 covers some serious, repeat and recordkeeping violations where the standard allows it, and the egregious policy covers willful cases. Multiple citation items in one inspection can stack quickly.

Yes. 29 CFR 1910.1200(g)(8) explicitly allows electronic SDS access if employees have immediate access during their work shift. However, you need a backup for connectivity outages. HazComFast loads your jobsite's SDS onto the phone before the signal drops, and a printed set at a central location covers a dead battery.

Stop hoping OSHA doesn't show up

Free plan, no credit card. Cancel anytime. No long-term contract.

Start Free Trial

Subcontractor portal · Offline SDS access · Construction HazCom guide

Get the Binder in Order Before the Inspector Arrives. Are You Ready?

OSHA inspections come unannounced, apart from the few exceptions listed in 29 CFR 1903.6. Get the binder in order before the opening conference, not during it.

Serious Violation

$16,550

per violation (max)

HazComFast Pro

$199/mo

10 jobsites, unlimited chemicals, unlimited workers

New sign-ups are paused. The free tools below need no account, and customers can log in as usual.

Your account keeps working as usual. Cancel anytime.