What 29 CFR 1926.950 requires (plain English)
29 CFR 1926.950 opens Subpart V, Electric Power Transmission and Distribution, which covers the construction of electric power transmission and distribution lines and equipment. This includes erecting new lines and equipment and the alteration, conversion, and improvement of existing installations. It is the construction parallel to the general-industry standard 1910.269 (which covers operation and maintenance of the same systems). 1926.950(a)(3) sends line-clearance tree trimming for utilities and work on electric power generation installations to 1910.269, and an employer that complies with 1910.269 is considered in compliance with the provisions of Subpart V that do not reference other subparts of Part 1926, but not with its obligations under those other subparts (note to (a)(1)(i)).
Paragraph (b) has each employee trained in the safety-related work practices that pertain to the job assignment and in any other safety practices, including applicable emergency procedures such as pole-top and manhole rescue; each qualified employee also trained and competent in the skills and techniques to distinguish exposed live parts, to determine the nominal voltage of exposed live parts, the minimum approach distances and the proper use of special precautionary techniques, personal protective equipment, insulating and shielding materials and insulated tools, and the recognition of electrical hazards; supervision and inspections on at least an annual basis; additional training or retraining under the conditions of (b)(4); classroom or on-the-job training; and demonstration of proficiency before an employee is considered as having completed the training. Paragraph (c) has the host employer, before work begins, inform contract employers of the characteristics of its installation listed in (d)(1) through (d)(5), the conditions listed in (d)(6) through (d)(8) that are known to it, information about the design and operation of the installation that the contract employer needs for the assessments the subpart requires, and other information the contract employer requests; the contract employer instructs its employees in the hazardous conditions, advises the host employer of any unique hazardous conditions before work begins, and advises it of any unanticipated hazardous conditions within 2 working days after discovering them; and the two employers coordinate their work rules and procedures. Paragraph (d) lists nominal voltages, maximum switching-transient voltages, hazardous induced voltages, protective grounds and equipment grounding conductors, locations of circuits and equipment, condition of protective grounds, condition of poles and environmental conditions relating to safety. The job briefing is in 1926.952, qualified employees and minimum approach distances in 1926.960, de-energizing in 1926.961 and grounding in 1926.962.
The rulemaking of 2014 (79 FR 20316) revised Subpart V; the note to (a)(1)(i) states the relation between Subpart V and 1910.269. A generic lockout/tagout procedure does not replace the de-energizing procedure of 1926.961 or the grounding of 1926.962.