OSHA's standard (29 CFR 1910.119) for the management of hazards associated with processes using highly hazardous chemicals, a term the standard defines as a substance possessing toxic, reactive, flammable or explosive properties and specified by paragraph (a)(1). It applies to a process that involves a chemical at or above the threshold quantity listed in Appendix A, or a Category 1 flammable gas or a flammable liquid with a flashpoint below 100 °F on site in one location in a quantity of 10,000 pounds or more, except for hydrocarbon fuels used solely for workplace consumption as a fuel (if not part of a process containing another covered highly hazardous chemical) and flammable liquids stored in atmospheric tanks or transferred that are kept below their normal boiling point without benefit of chilling or refrigeration (1910.119(a)(1)). It does not apply to retail facilities, oil or gas well drilling or servicing operations, or normally unoccupied remote facilities (1910.119(a)(2)). Coverage is decided for the process, with its chemical, quantity, use and these exceptions, not from a stock figure alone. The standard has 14 elements, from employee participation and process hazard analysis to mechanical integrity, management of change and compliance audits.
Also known as: PSM, process safety management of highly hazardous chemicals
On this page
Process Safety Management (PSM) at a glance
- Coverage test (1910.119(a)(1)): a process that involves a chemical at or above its Appendix A threshold quantity, or 10,000 pounds or more of a Category 1 flammable gas or a flammable liquid with a flashpoint below 100 °F on site in one location, subject to the fuel-only and atmospheric-tank exceptions of (a)(1)(ii)(A) and (B). Retail facilities, oil or gas well drilling or servicing operations, and normally unoccupied remote facilities are excluded (1910.119(a)(2)).
- 14 elements, by paragraph: (c) employee participation, (d) process safety information, (e) process hazard analysis, (f) operating procedures, (g) training, (h) contractors, (i) pre-startup safety review, (j) mechanical integrity, (k) hot work permit, (l) management of change, (m) incident investigation, (n) emergency planning and response, (o) compliance audits, (p) trade secrets.
- Process hazard analysis: an initial analysis on covered processes (1910.119(e)(1)), then updated and revalidated at least every five years after the completion of the initial analysis by a team with the required expertise, to assure it is consistent with the current process (1910.119(e)(6)).
- Compliance audits: the employer certifies that compliance with the section has been evaluated at least every three years (1910.119(o)(1)).
- Incident investigation: each incident that resulted in, or could reasonably have resulted in, a catastrophic release of a highly hazardous chemical in the workplace is investigated (1910.119(m)(1)), and the investigation is initiated as promptly as possible, no later than 48 hours following the incident (1910.119(m)(2)). The 48-hour clock applies to those incidents, not to every workplace incident.
- Management of change: written procedures manage changes to process chemicals, technology, equipment and procedures, and changes to facilities that affect a covered process, except replacements in kind (1910.119(l)(1)). Before a change, the procedures address its technical basis, its impact on safety and health, modifications to operating procedures, the necessary time period and the authorization requirements (1910.119(l)(2)).
- The standard was published in the Federal Register on February 24, 1992. OSHA's Process Safety Management page says PSM is addressed in specific standards for the general and construction industries; this page summarizes 1910.119.
In plain English
The safety program OSHA's 1910.119 sets for processes using certain highly hazardous chemicals. It has 14 elements. They include knowing your process, analyzing the hazards, writing procedures, training workers, maintaining equipment and reviewing changes before they are made.
What the source says, in summary
This section applies to the following: (i) A process which involves a chemical at or above the specified threshold quantities listed in appendix A to this section; (ii) A process which involves a Category 1 flammable gas (as defined in 1910.1200(c)) or a flammable liquid with a flashpoint below 100 °F (37.8 °C) on site in one location, in a quantity of 10,000 pounds (4535.9 kg) or more except for: (A) Hydrocarbon fuels used solely for workplace consumption as a fuel (e.g., propane used for comfort heating, gasoline for vehicle refueling), if such fuels are not a part of a process containing another highly hazardous chemical covered by this standard; (B) Flammable liquids with a flashpoint below 100 °F (37.8 °C) stored in atmospheric tanks or transferred which are kept below their normal boiling point without benefit of chilling or refrigeration.
In context
An enforcement, recordkeeping, or general-duty concept under the Occupational Safety and Health Act and 29 CFR. These terms define how OSHA inspects, cites, and penalizes employers.
Where this is written in OSHA's rules
- 29 CFR 1910.119Read on eCFR / OSHA.gov
- 29 CFR 1910.119(a)(1)Read on eCFR / OSHA.gov
Example
In this invented illustration, a chemical plant has a process involving 15,000 lb of anhydrous ammonia. Appendix A to 1910.119 lists anhydrous ammonia with a threshold quantity of 10,000 lb, so the process falls within the coverage test; coverage is decided for the process and its exceptions, not from the stock figure alone. The plant keeps process safety information, performs a process hazard analysis with a recognized methodology such as HAZOP and revalidates it on the five-year schedule, certifies compliance audits every three years, and runs proposed changes through its management of change procedure. When a heat exchanger is replaced with a different model, that is a change to equipment, not a replacement in kind, so the procedure's considerations are addressed before the new unit starts. Replacing a failed part with an identical one is a replacement in kind, which the management of change paragraph excepts.
Why it matters
OSHA's Process Safety Management page says unexpected releases of toxic, reactive, or flammable liquids and gases in processes involving highly hazardous chemicals have been reported for many years in various industries, and that there is a potential for an accidental release any time they are not properly controlled, creating the possibility of disaster. It describes the standard as establishing a comprehensive management program that integrates technologies, procedures, and management practices. EPA's Risk Management Program rule is a related chemical accident prevention program.
PSM (OSHA) vs. RMP (EPA)
OSHA's Process Safety Management standard (1910.119) is the OSHA standard for the management of hazards of processes using highly hazardous chemicals. EPA's Risk Management Program (RMP, 40 CFR Part 68) comes from section 112(r) of the Clean Air Act and is a separate chemical accident prevention rule: EPA's overview says covered facilities develop a Risk Management Plan that identifies the potential effects of a chemical accident, the steps the facility is taking to prevent one and the emergency response procedures, and says the plans give local fire, police and emergency response personnel information for their community. Each program has its own list of chemicals and threshold quantities, so a facility checks both separately. PSM is not a general chemical-inventory rule: it applies to the processes the coverage test captures.
PSM key triggers and timeframes (1910.119)
| Item | Threshold / frequency |
|---|---|
| Flammable coverage trigger | 10,000 pounds of a Category 1 flammable gas or a flammable liquid with a flashpoint below 100 °F in one location, unless an exception applies (1910.119(a)(1)) |
| Listed chemical coverage trigger | At or above the Appendix A threshold quantity (1910.119(a)(1)) |
| Process hazard analysis update and revalidation | At least every five years after completion of the initial analysis (1910.119(e)(6)) |
| Compliance audit | Evaluated and certified at least every three years (1910.119(o)(1)) |
| Incident investigation start | As promptly as possible, no later than 48 hours following an incident that resulted in, or could reasonably have resulted in, a catastrophic release (1910.119(m)(1), 1910.119(m)(2)) |
Process Safety Management (PSM): frequently asked questions
- What is Process Safety Management (PSM)?
- OSHA's standard (29 CFR 1910.119) for the management of hazards associated with processes using highly hazardous chemicals, a term the standard defines as a substance possessing toxic, reactive, flammable or explosive properties and specified by paragraph (a)(1). It applies to a process that involves a chemical at or above the threshold quantity listed in Appendix A, or a Category 1 flammable gas or a flammable liquid with a flashpoint below 100 °F on site in one location in a quantity of 10,000 pounds or more, except for hydrocarbon fuels used solely for workplace consumption as a fuel (if not part of a process containing another covered highly hazardous chemical) and flammable liquids stored in atmospheric tanks or transferred that are kept below their normal boiling point without benefit of chilling or refrigeration (1910.119(a)(1)). It does not apply to retail facilities, oil or gas well drilling or servicing operations, or normally unoccupied remote facilities (1910.119(a)(2)). Coverage is decided for the process, with its chemical, quantity, use and these exceptions, not from a stock figure alone. The standard has 14 elements, from employee participation and process hazard analysis to mechanical integrity, management of change and compliance audits.
- What triggers PSM coverage?
- A process is covered if it involves a chemical at or above the threshold quantity listed in Appendix A, or a Category 1 flammable gas or a flammable liquid with a flashpoint below 100 °F on site in one location in a quantity of 10,000 pounds or more (1910.119(a)(1)). Two exceptions narrow the flammable test: hydrocarbon fuels used solely for workplace consumption as a fuel, and flammable liquids stored in atmospheric tanks or transferred that are kept below their normal boiling point without benefit of chilling or refrigeration. Retail facilities, oil or gas well drilling or servicing operations, and normally unoccupied remote facilities are not covered (1910.119(a)(2)). A quantity alone does not decide coverage: the chemical, process, use and exceptions do.
- How often must the process hazard analysis be updated?
- At least every five years after the completion of the initial process hazard analysis, it is updated and revalidated by a team with the required expertise, to assure it is consistent with the current process (1910.119(e)(6)). The initial analysis is a separate step (1910.119(e)(1)), and the compliance audit is a separate evaluation at least every three years (1910.119(o)(1)).
- What are the 14 elements of PSM?
- Employee participation; process safety information; process hazard analysis (PHA); operating procedures; training; contractors; pre-startup safety review; mechanical integrity; hot work permit; management of change (MOC); incident investigation; emergency planning and response; compliance audits; and trade secrets. They are paragraphs (c) through (p) of 1910.119 and work together as one management program.
Related terms
Free tools for this
Governing OSHA standards
More OSHA terms
The action an employer takes to fix a cited violation or eliminate a hazard OSHA identified during an inspection. The abatement date starts as the date set in the citation and can move later through an approved petition for modification of abatement date (PMA), a settlement or, for a contested item, the final order. Within 10 calendar days after that date the employer must certify to OSHA that each cited violation was abated, unless the compliance officer saw the fix within 24 hours during the on-site inspection and noted it in the citation (29 CFR 1903.19(b)(2), (c)). For an item left uncorrected, OSHA can assess a penalty of up to $16,550 per day.
Area DirectorThe senior OSHA official in charge of a specific OSHA Area Office, the local unit that runs inspections and enforcement in its geographic territory. The Area Director reviews the inspector's report, issues citations, determines the proposed penalties, holds informal conferences with employers, and can enter into informal settlement agreements before a case is contested; once an employer contests, the Regional Solicitor's office takes part. When a Compliance Safety and Health Officer (CSHO) completes an inspection, it's the Area Director who issues the citation (29 CFR 1903.14(a), 1903.15(b); OSHA Field Operations Manual, ch. 7).
Bureau of Labor Statistics (BLS)The federal statistical agency within the U.S. Department of Labor that collects, analyzes, and publishes data on workplace injuries, illnesses, and fatalities. BLS conducts the annual Survey of Occupational Injuries and Illnesses (SOII), a survey of randomly selected employers built on their OSHA injury and illness records, and the Census of Fatal Occupational Injuries (CFOI). OSHA's Site-Specific Targeting (SST) program builds its inspection lists from the Form 300A data that employers submit to OSHA under 29 CFR 1904.41, not from the BLS survey.
Competent PersonUnder OSHA's construction standards, a person who is capable of identifying existing and predictable hazards in the surroundings or working conditions, and who has the authorization to take prompt corrective measures to eliminate them. The role requires both knowledge and the authority to act, and is mandated by name in many specific standards: excavations, scaffolds, fall protection, asbestos, and more.
CitationThe formal written notice OSHA issues to an employer after an inspection. It describes each alleged violation with particularity, names the provision alleged to have been violated, and fixes a reasonable time to correct (abate) it. The proposed penalty comes in a separate notice of proposed penalty, sent with or after the citation, and that notice can also say that no penalty is proposed. OSHA must issue a citation with reasonable promptness and no later than six months after the violation occurred (OSH Act §9; 29 CFR 1903.14(a), 1903.15(a)).
Closing ConferenceThe meeting at the end of an OSHA inspection where the compliance officer confers with the employer and the employee representatives, together or separately, and informally advises them of any apparent violations found. The employer can also bring pertinent information about conditions in the workplace to the compliance officer's attention. The closing conference discusses what was observed and the parties' rights. It issues no citation and sets no penalty: those come later in the written Citation and Notification of Penalty (29 CFR 1903.7(e); OSHA Field Operations Manual, ch. 3).
Compliance Officer (CSHO)An OSHA Compliance Safety and Health Officer, the inspector who conducts workplace inspections. A CSHO presents credentials (a photo ID and a serial number), holds the opening conference, performs the walkaround, collects evidence, interviews employees, and reports the findings to the Area Director, who reviews the report and decides whether to issue a citation. CSHOs may specialize as safety specialists or as industrial hygienists, and the scope of each inspection is explained at the opening conference (29 CFR 1903.7(a), 1903.14(a)).
ContestAn employer's formal challenge to an OSHA citation, proposed penalty, or abatement date. To contest, the employer notifies the OSHA Area Director in writing, with a notice postmarked within 15 working days of receiving the notice of proposed penalty (29 CFR 1903.17(a)). The Area Director forwards it to the independent Occupational Safety and Health Review Commission (OSHRC), a federal agency that resolves these disputes. Without a timely notice, the citation and proposed penalty become a final order that no court or agency reviews (29 CFR 1903.15(a)).
Sources & verification
- 29 CFR 1910.119 (eCFR / OSHA.gov)
- 29 CFR 1910.119(a)(1) (eCFR / OSHA.gov)
- OSHA: 29 CFR 1910.119 (Process Safety Management)
- OSHA: Process Safety Management (Safety and Health Topics)
- EPA: Risk Management Program (RMP) Rule Overview
Checked against the eCFR, OSHA.gov and epa.gov. Last reviewed 2026-10-27. This glossary is general information, not legal advice; OSHA State-Plan states (e.g. California, Michigan) may adopt stricter requirements.
A related free tool
The free Hot Work Permit Template With Fire Watch covers a task related to Process Safety Management (PSM). Read the rule above first, then use the tool for your own workplace.
Get the Binder in Order Before the Inspector Arrives. Are You Ready?
OSHA inspections come unannounced, apart from the few exceptions listed in 29 CFR 1903.6. Get the binder in order before the opening conference, not during it.
Serious Violation
$16,550
per violation (max)
HazComFast Pro
$199/mo
10 jobsites, unlimited chemicals, unlimited workers
New sign-ups are paused. The free tools below need no account, and customers can log in as usual.
Your account keeps working as usual. Cancel anytime.