What 29 CFR 1910.119 requires (plain English)
29 CFR 1910.119, Process Safety Management of Highly Hazardous Chemicals (PSM), is OSHA's rule for preventing catastrophic releases of toxic, reactive, flammable, or explosive chemicals. It applies to a process that contains a chemical listed in Appendix A at or above its threshold quantity, or 10,000 pounds or more of a Category 1 flammable gas or a flammable liquid with a flashpoint below 100 °F on site in one location (1910.119(a)(1)(ii)). Exceptions: hydrocarbon fuels used solely for workplace consumption as a fuel (for example, propane for comfort heating, gasoline for vehicle refueling) when they are not part of a process containing another covered highly hazardous chemical; flammable liquids below 100 °F flashpoint stored in atmospheric tanks or transferred, kept below their normal boiling point without chilling or refrigeration ((a)(1)(ii)(A)-(B)). The standard does not apply to retail facilities, oil or gas well drilling or servicing operations, or normally unoccupied remote facilities ((a)(2)). The manufacture of explosives and pyrotechnics also meets 1910.119 (1910.109(k)(2)-(3)). PSM is a management system of 14 elements.
Those elements include compiling process safety information (chemical, technology, and equipment data); performing a process hazard analysis (PHA) by a method such as HAZOP or What-If; written operating procedures; employee training; contractor management; pre-startup safety reviews; mechanical integrity of critical equipment; a hot work permit program; management of change (MOC); incident investigation; emergency planning; and compliance audits. The employer develops a written plan of action for employee participation, consults employees and their representatives on the process hazard analyses and the other elements, and gives them access to the PHA and the other information the standard requires ((c)). The PHA team must have expertise in engineering and process operations, include at least one employee with experience and knowledge specific to the process, and include a member knowledgeable in the PHA method used ((e)(4)); the employer must promptly address the team's findings, resolve them in a timely manner with documentation and a written schedule ((e)(5)). Management of change covers every change to process chemicals, technology, equipment, procedures and facilities that affect the process, except replacements in kind, and requires the technical basis, safety and health impact, changes to operating procedures, time period and authorization to be addressed, and affected operators, maintenance and contract employees to be informed and trained before start-up ((l)(1)-(3)).
PSM sets these intervals: the PHA must be updated and revalidated at least every five years ((e)(6)), and the PHA, its updates and the documented resolution of recommendations are retained for the life of the process ((e)(7)); a compliance audit must be certified at least every three years ((o)(1)), and the two most recent audit reports are retained ((o)(5)); the employer must certify annually that operating procedures are current and accurate ((f)(3)); operators need refresher training at least every three years, with documented verification of understanding ((g)(2)-(3)); an incident investigation must begin within 48 hours of an incident that resulted in, or could reasonably have resulted in, a catastrophic release (1910.119(m)(2)); and the frequency of equipment inspections and tests follows the manufacturer's recommendations and good engineering practice, more often if prior operating experience calls for it ((j)(4)(iii)), with no single universal date. EPA's Risk Management Program (40 CFR Part 68) applies to stationary sources at which more than a threshold quantity of a regulated substance is present in a process; EPA places processes already subject to PSM in Program 3.