29 CFR 1926.1416

29 CFR 1926.1416 requires that "operational aids" on cranes (devices such as the anti-two-block device, which must automatically prevent damage on telescopic boom cranes made after February 28, 1992 and on lattice boom cranes and derricks made after November 8, 2011, but may only warn on some older lattice boom cranes, boom hoist limiting device, boom angle or radius indicator, and load-moment (rated capacity) indicator or limiter) be present and functional on covered equipment, unless otherwise specified. If a listed operational aid stops working properly during operations, the operator safely stops operations until the temporary alternative measures are implemented or the device works again (1926.1416(c)); Category I aids are repaired within 7 calendar days and Category II aids within 30 calendar days, with a documented parts-order exception ((d)-(e)).

29 CFR 1926.1416 at a glance

What they are
Listed operational aids (1926.1416); the safety devices of 1926.1415 are a different category: a safety device that is not working properly is taken out of service, without alternative measures
Examples
Anti-two-block device (automatic prevention is required on telescopic booms made after Feb 28, 1992 and lattice booms made after Nov 8, 2011; a warning alone is allowed only on some older lattice booms), boom hoist limiter, boom angle/radius indicator, load-moment indicator
Requirement
The listed aids are required on covered equipment unless otherwise specified; some do not apply to articulating cranes, and some apply to digger derricks only if manufactured after November 8, 2011 ((a)(1)-(2))
If one fails
Stop until temporary measures are in place; repair within 7 calendar days (Category I) or 30 calendar days (Category II), longer only if parts were ordered within 7 days (1926.1416(c)-(e))
Not a substitute
Safety devices and operational aids are not used as a substitute for the exercise of professional judgment by the operator (1926.1417(k))
Max penalty (2026)
$16,550 per serious violation; $165,514 per willful

What 29 CFR 1926.1416 requires (plain English)

29 CFR 1926.1416 requires "listed operational aids" on cranes and derricks covered by Subpart CC. The listed operational aids include the boom hoist limiting device, the luffing jib limiting device, the anti two-blocking device, the boom angle or radius indicator, jib angle indicators, load-moment (rated capacity) indicators or limiters, and outrigger/stabilizer position sensing devices, depending on the type and capacity of the equipment.

The devices listed in the section are required on all equipment covered by the subpart, unless otherwise specified. When a listed operational aid stops working or malfunctions, the operator must first safely stop operations until temporary alternative measures are implemented or the device is again working properly (1926.1416(c)); Category I aids must then be repaired within 7 calendar days and Category II aids within 30 calendar days (a longer period applies only if the parts were ordered within 7 days and documented), (d)-(e). The temporary alternative measures are specific to each device (for example, for the boom hoist limiting device: a boom angle indicator, a marked boom hoist cable, or a marked cable seen by a spotter); a signal person or a calculation of any kind is not a general alternative, and more protective alternative measures specified by the manufacturer are followed ((b)). The listed aids also include the boom length indicator on telescopic booms ((e)(3)) and, on equipment manufactured after November 8, 2011, outrigger/stabilizer position sensors and hoist drum rotation indicators ((e)(5)); the type, the manufacture date and the capacity of the equipment determine the obligations and the exceptions: a lattice boom crane manufactured after February 28, 1992 may have a device that warns the operator in time to prevent two-blocking, while one manufactured after November 8, 2011 has a device that automatically prevents it ((d)(3)(ii)). The inspection of each shift is in 1926.1412; derricks have their own provisions in 1926.1436.

1926.1416 works alongside the operation requirements of 1926.1417: safety devices and operational aids must not be used as a substitute for the exercise of professional judgment by the operator (1926.1417(k)), and the equipment must not be operated in excess of its rated capacity (1926.1417(o)(1)). The safety devices of 1926.1415 are a different category: if one is not in proper working order, the equipment is taken out of service and operations do not resume until the device is again working properly; alternative measures are not permitted (1926.1415(b)).

The regulatory text

“The devices listed in this section ("listed operational aids") are required on all equipment covered by this subpart, unless otherwise specified.”
29 CFR 1926.1416(a)

Key facts about 29 CFR 1926.1416

  • Listed operational aids are required on covered crane equipment (1926.1416(a)).
  • They include the anti-two-block device, boom hoist limiter, and boom angle/radius indicator.
  • They also include load-moment (rated capacity) indicators or limiters where applicable.
  • When a listed aid fails, stop until temporary measures are in place; repair Category I aids within 7 calendar days and Category II aids within 30 calendar days (parts-order exception), 1926.1416(d)-(e).
  • If a listed aid stops working properly during operations, the operator safely stops until the temporary alternative measures are implemented or the device works again (1926.1416(c)); a replacement part no longer available may be replaced by a substitute device that performs the same function (c).
  • Safety devices and operational aids must not be used as a substitute for the exercise of professional judgment by the operator (1926.1417(k)); more protective alternative measures specified by the manufacturer are followed (1926.1416(b)).
  • Paragraphs (e)(1) to (e)(3) do not apply to articulating cranes, and (d)(3), (e)(1) and (e)(4) apply only to digger derricks manufactured after November 8, 2011 (1926.1416(a)(1)-(2)).

Scope: who 29 CFR 1926.1416 applies to

Regulatory framework
Construction (29 CFR 1926)
Citation reference
29 CFR 1926.1416
Enforcement status
In force and enforced
Jurisdiction
Federal OSHA (29 State-Plan jurisdictions may be stricter)

State-Plan states (e.g. California, Washington, Michigan) operate OSHA-approved programs that must be at least as effective as federal OSHA and frequently impose higher penalties or additional requirements.

Key requirements of 29 CFR 1926.1416

#What the section requires or covers
1Do not begin operations unless the listed operational aids are in proper working order, except while an aid is being repaired and the temporary alternative measures are used (1926.1416(b))
2Category I aids (boom hoist limiting device, luffing jib limiting device, anti-two-blocking device and the others in paragraph (d)) must be repaired within 7 calendar days of the deficiency (1926.1416(d))
3Category II aids (boom angle or radius indicator, jib angle indicator, boom length indicator, load weighing and similar devices) must be repaired within 30 calendar days (1926.1416(e))
4Equipment other than derricks and articulating cranes manufactured after March 29, 2003 with a rated capacity over 6,000 pounds must have at least one of a load weighing device, a load moment (or rated capacity) indicator, or a load moment (or rated capacity) limiter (1926.1416(e)(4))
5When an aid stops working during operations, the operator must safely stop until the temporary alternative measures are in place or the aid works again, and must follow any more protective measures the manufacturer specifies (1926.1416(b)-(c))

Summarized from the text of 29 CFR 1926.1416.

Common Crane Operational Aids violations

Deficiencies OSHA cites under 29 CFR 1926.1416 include the ones below, in no particular order. Each serious item carries up to $16,550 (2026).

  • Operating with a non-functional listed operational aid and no temporary measures (1926.1416).
  • A required operational aid not installed on covered equipment (1926.1416(a)).
  • Exceeding the 7-day (Category I) or 30-day (Category II) repair period for a failed aid, without the documented parts-order exception (1926.1416(d)-(e)).
  • Beginning operations when a listed operational aid is not in proper working order, outside the case of an aid being repaired with the specified temporary alternative measures (1926.1416(b)).
  • Anti two-blocking or load weighing device not in proper working order while operations continue without the temporary alternative measures (1926.1416(b)-(c)); a warning-only anti two-blocking device on equipment that requires automatic prevention (1926.1416(d)(3)).

Stop first, then temporary measures and repair

1926.1416(c) has the operator safely stop operations when a listed operational aid stops working properly, until the temporary alternative measures are implemented or the device is again working properly. Category I aids not working properly are repaired no later than 7 calendar days after the deficiency occurs, unless the employer documents that the necessary parts were ordered within 7 calendar days, in which case the repair is completed within 7 calendar days of receipt of the parts (d); Category II aids follow the 30-day period of (e) with its own conditions. The safety devices of 1926.1415 are a different category: they are taken out of service without alternative measures. The lift plan is not a person responsible and does not replace the operator.

What OSHA inspectors look for

A compliance officer checks that the required operational aids are installed and working, and that when an aid is out of service the employer followed the standard's temporary measures and repair timeframes rather than simply ignoring the failure. Operations do not begin unless the listed operational aids are in proper working order, except where an aid is being repaired and the specified temporary alternative measures are used; more protective measures specified by the manufacturer are followed (1926.1416(b)).

Example: how a violation is cited

Hypothetical case: a crane's anti-two-block device is not working, and operations continue without the specified temporary alternative measures. 1926.1416(c) has the operator safely stop operations until the temporary alternative measures are implemented or the device is again working properly. A serious violation carries a penalty of up to $16,550.

Illustrative example, not a specific OSHA case.

Crane Operational Aids compliance checklist

Each item is a requirement of 29 CFR 1926.1416 that OSHA may verify during an inspection.

  • Do not begin operations unless the listed operational aids are in proper working order, except where an aid is being repaired and the specified temporary alternative measures are used (1926.1416(b)).
  • Identify which aids apply to the crane by type, manufacture date and capacity (1926.1416(a), (d), (e)).
  • If a listed aid stops working properly during operations, safely stop operations until the temporary alternative measures for that aid are implemented or the device works again (1926.1416(c)).
  • Repair Category I aids no later than 7 calendar days and Category II aids no later than 30 calendar days after the deficiency occurs, or within 7 calendar days of receipt of parts documented as ordered within 7 days (1926.1416(d)-(e)).
  • Follow more protective alternative measures specified by the crane or derrick manufacturer (1926.1416(b)).
  • Do not use safety devices and operational aids as a substitute for the operator's professional judgment (1926.1417(k)).

Do it now, free: Free crane inspection checklist

When the inspector arrives, pick the jobsite and the sections, preview the table of contents, and print one inspection-ready PDF for that site. Inspection-ready reports in HazComFast

2026 penalties for 29 CFR 1926.1416

Maximums set by 29 CFR 1903.15(d). 2026 maximums unchanged from 2025 (no CPI adjustment; OMB M-26-11), so not an increase; the serious and repeat policy minimums were revised with FOM chapter 6 (OSHA memo of May 21, 2026). The 2025 OSHA penalty levels remain in effect for 2026; OSHA made no inflation adjustment for 2026. 29 CFR 1903.15 identifies January 15, 2025 as the effective reference for these amounts, while OSHA's public penalties page currently references penalties assessed after Jan. 15, 2026.

Violation typeMinimumMaximumWhen it applies
Serious$1,085$16,550Death or serious physical harm could result, and the employer knew or could have known (29 U.S.C. 666(k)).
Other-Than-Serious$0$16,550Relates to safety/health but unlikely to cause death or serious harm.
Willful$11,823$165,514Intentional, knowing, or voluntary disregard of the requirement.
Repeated$4,256$165,514A substantially similar violation cited within the last 5 years.
Failure to AbateNone$16,550/dayup to $16,550 per day; the total is normally capped at 30 times the daily amount (FOM Ch.6)

Serious violations reach $16,550 and willful or repeat violations $165,514.

Maximums and the willful minimum are set by 29 CFR 1903.15(d); the serious and repeated minimums are OSHA policy floors from its annual penalty adjustment memo. OSHA applies gravity-based and size, good-faith and history reductions (FOM CPL 02-00-164 Ch.6). Estimates only, not legal advice.

The business case for Crane Operational Aids compliance

1926.1416(a) has the listed operational aids required on all equipment covered by Subpart CC, unless otherwise specified; (b) has operations not begin unless they are in proper working order, except where an aid is being repaired and the specified temporary alternative measures are used; (c) has the operator safely stop operations if a listed aid stops working properly during operations, until the temporary alternative measures are implemented or the device works again.

State plans and their penalty rules

States listed by the volume of their federal construction citations, not by this standard. Penalties and enforcement vary by state. State-Plan states may impose higher penalties and additional requirements beyond federal 29 CFR 1926.1416.

State pages for 29 CFR 1926.1416

Frequently asked questions about 29 CFR 1926.1416

What are crane operational aids?

Under 1926.1416, the listed operational aids are the devices the section requires on covered cranes, including the anti two-blocking device, boom hoist limiting device, boom angle or radius indicator, jib angle indicator, load-moment (rated capacity) indicator or limiter, and outrigger position devices. They must be present and functional on the equipment, unless the standard specifies otherwise.

What happens if a crane operational aid stops working?

1926.1416(c) has the operator safely stop operations until the temporary alternative measures are implemented or the device is again working properly. The temporary alternative measures are specific to each aid, and the repair period is 7 calendar days for Category I aids and 30 calendar days for Category II aids, with a documented parts-order exception ((d)-(e)).

What is an anti-two-block device?

It is a device that automatically prevents damage and load failure from contact between the load block, overhaul ball, or similar component, and the boom tip (or fixed upper block), or, on lattice boom cranes manufactured after February 28, 1992 but not after November 8, 2011, warns the operator in time to prevent two-blocking (1926.1416(d)(3)). It is a Category I aid. If it is not working, the temporary alternative measure for telescopic boom cranes is to clearly mark the cable at a point that gives the operator sufficient time to stop the hoist, and to use a spotter when extending the boom; for lattice boom cranes, to mark the cable or use a spotter.

Do operational aids replace the operator's judgment?

No. Under 1926.1417(k), safety devices and operational aids must not be used as a substitute for the exercise of professional judgment by the operator, and under 1926.1417(o)(1) the equipment must not be operated in excess of its rated capacity.

Regulatory history of 29 CFR 1926.1416

The operational-aids requirements in 1926.1416 are part of Subpart CC (75 FR 47906, effective November 8, 2010). Several aids apply by manufacture date: February 28, 1992 for anti two-blocking devices on telescopic and lattice boom cranes, March 29, 2003 for load weighing and similar devices, and November 8, 2011 for automatic anti two-blocking on lattice boom cranes and derricks and for the devices of (e)(5).

Related glossary terms

Key terms that appear in 29 CFR 1926.1416, each with a full plain-English explainer.

Get the Binder in Order Before the Inspector Arrives. Are You Ready?

OSHA inspections come unannounced, apart from the few exceptions listed in 29 CFR 1903.6. Get the binder in order before the opening conference, not during it.

Serious Violation

$16,550

per violation (max)

HazComFast Pro

$199/mo

10 jobsites, unlimited chemicals, unlimited workers

New sign-ups are paused. The free tools below need no account, and customers can log in as usual.