Skip to content

Urgent: Nov 20, 2026 — HCS 2024 Deadline. Get ready →

Free Construction Safety Template

Site-Specific Safety Plan Template

One plan per jobsite: the project, the emergency details, the written programs part 1926 calls for, each cited, the hazards and controls, the competent persons and the orientation sign-off. Free Word and PDF, blank or filled in. No signup.

Verified vs OSHA sources · Oct 20, 2026

Construction, 29 CFR 1926 Back to Tools

Free tool. No signup, no account. Want one company plan, with its own copy for every jobsite? HazComFast (the app) is our paid product.

PDF to print

Site-Specific Safety Plan, ready to print on Letter paper. The example shows it filled in.

Word to edit

The same form as a .docx file: add your logo, your items and your own rows.

No federal OSHA standard calls for a document named a site-specific safety plan; owners and general contractors do. What part 1926 asks is that the employer run the programs needed to comply (29 CFR 1926.20(b)(1)) with frequent and regular inspections by competent persons (1926.20(b)(2)). This free Word template puts the site's emergency details and every written program the work calls for, each cited, in one document.

At a glance

  • No general OSHA rule for a site-specific plan; programs and competent person inspections are owed (1926.20(b)(1), (b)(2)).
  • Medical provisions made before the project starts (1926.50(b)); first aid person where no care is reasonably accessible (1926.50(c)).
  • Written programs by the work: HazCom (1910.1200(e)(1)), fire protection (1926.150(a)(1)), silica (1926.1153(g)(1)), emergency action plan where a standard calls for one (1926.35(b)).
  • A fall protection plan only for leading edge, precast or residential work under 1926.502(k).

Preview

HazComFast

Site-Specific Safety Plan

Construction, 29 CFR 1926: written programs cited one by one

Stated in the cited OSHA paragraph From the manufacturer, a consensus standard or good practice

01Project

Project name

Site address

Owner or client

General contractor

Our company and role

Scope of our work

Start and end dates

Crew size, peak

Plan prepared by

Revision and date

02Emergency information

Nearest hospital or clinic, address

Hospital phone

911 available at the site? (Y/N)

Assembly point

First aid kit locations

Fire extinguisher locations

Person trained in first aid on site

Emergency contact, our company

03The duties this plan organizes

“(b) Accident prevention responsibilities. (1) It shall be the responsibility of the employer to initiate and maintain such programs as may be necessary to comply with this part.”

29 CFR 1926.20(b)(1)

“(2) Such programs shall provide for frequent and regular inspections of the job sites, materials, and equipment to be made by competent persons designated by the employers.”

29 CFR 1926.20(b)(2)

04Written programs and plans this project needs

Mark Yes for each one the work calls for and attach it, or say where it is kept.

ItemYesNoN/A
01Hazard communication: written program and list of hazardous chemicals on site29 CFR 1926.59; 1910.1200(e)(1)
02Fire protection program for all phases of the work29 CFR 1926.150(a)(1)
03Emergency action plan, where a part 1926 standard calls for one29 CFR 1926.35(b)
04Silica: written exposure control plan, where the work falls under the silica standard29 CFR 1926.1153(a), (g)(1)
05Fall protection plan, only for leading edge, precast concrete or residential work where conventional fall protection is shown infeasible or a greater hazard29 CFR 1926.502(k)
06Prompt medical attention arranged before the project starts29 CFR 1926.50(b)
07Person with a valid first aid certificate at the site, where no infirmary, clinic, hospital or physician is reasonably accessible29 CFR 1926.50(c)
08Where 911 is not available: physician, hospital or ambulance numbers posted29 CFR 1926.50(f)(1)

05Work activities, hazards and controls

ActivityHazardsControlsStandardCompetent person

3 more rows in the file.

06Competent persons and inspections

Who inspects what, how often you have set it, and where the record is kept.

What is inspectedCompetent personFrequency you setRecord kept

2 more rows in the file.

07Subcontractors and other employers on site

CompanyScopeContact, phoneSDS and labels exchanged (date)

1 more rows in the file.

08Site orientation: read and understood

Printed nameCompanyDateSignature

7 more rows in the file.

Plan approved by

Date

Learn more

Several Jobsites, One Emergency Plan Each, None Borrowed

Free tool. No signup, no account. Want to centralize SDSs and proof? HazComFast (the app) is our paid product.

Next step (recommended)

Write the site's emergency action plan

Use case: Jobsite plans

In HazComFast you write the company plan once; each jobsite gets its own copy with its exits, muster points and wardens, and a new company version shows every site what changed without overwriting it.

Inside HazComFast

One company plan, a current plan on every jobsite

A Word template gives you one site's plan on the day you write it. HazComFast keeps every site's plan tied to the company plan, so a change at the office reaches the field without erasing what the field knows.

  • Write the company plan once

    Each jobsite gets its own copy with its own exits, muster points and wardens. When the company plan changes, every site sees what changed, section by section, and nothing local is overwritten.
  • The right part of the CFR for the work

    A construction plan cites 1926.35 for emergencies and 1926.24 for fire; general industry cites 1910.38 and 1910.39. If you do both kinds of work, you get two plans, never a hybrid.
  • A plan that won't go out with blanks

    The plan won't export while a name or a phone number is still to fill, and the screen lists each one for you.
  • One PDF for the inspector, per site

    Pick the jobsite and the sections, preview the table of contents, and print one inspection-ready PDF for that site.

New sign-ups are paused · the free tools need no account

Does OSHA call for a site-specific safety plan?

Not by that name. The request comes from owners, general contractors and contracts, and the plan answers a rule that does exist: the employer initiates and maintains the programs needed to comply with part 1926 (29 CFR 1926.20(b)(1)), and those programs provide for frequent and regular inspections of the job sites, materials and equipment by competent persons the employer designates (1926.20(b)(2)). Each worker is also instructed in recognizing and avoiding the unsafe conditions of the work (1926.21(b)(2)), which the orientation section records. The 29 CFR 1926.20 page has the full text.

What goes in the plan

SectionWhat it holds
ProjectName, address, owner, general contractor, your role and scope, dates, crew size, revision
Emergency informationHospital and phone, 911 availability, assembly point, first aid kits and person, extinguishers, contacts
Written programsYes, No or N/A for each program part 1926 may call for, with its paragraph
Activities and hazardsEach activity, its hazards, its controls, the standard and the competent person
InspectionsWhat is inspected, by whom, how often, where the record is kept
SubcontractorsEach company, its scope, its contact and the date SDS and labels were exchanged
OrientationEach worker's name, company, date and signature

The written programs a site may need

The plan is a hub: each program keeps its own document and its own rule. Hazard communication needs a written program with the list of hazardous chemicals (29 CFR 1910.1200(e)(1), through 1926.59). Construction work has a fire protection program for all its phases (1926.150(a)(1)). An emergency action plan is written where a part 1926 standard calls for one (1926.35(b)). Work covered by the silica standard has a written exposure control plan (1926.1153(g)(1)). A fall protection plan exists only for leading edge, precast or residential work where conventional protection is shown infeasible (1926.502(k)), and the free fall protection plan builder writes it. The free emergency action plan builder writes the emergency plan, and the article on one emergency plan per jobsite explains why a plan borrowed from another site fails.

Competent persons, orientation and subcontractors

The inspections section names who inspects what; the free competent person designation letter puts each designation in writing. The orientation sign-off follows the new hire orientation checklist for construction, and the emergency action plan guide covers the emergency section in depth. With several employers on one site, the multi-employer responsibility matrix sorts out who does what.

What OSHA cited most on construction programs in FY2025

ParagraphWhat it coversFY2025 citations
1926.20(b)(2)Frequent and regular inspections by competent persons965
1926.20(b)(1)Programs initiated and maintained to comply with part 1926412
1926.20(b)(4)Only employees qualified by training or experience operate equipment22
1926.20(f)(2)Training standards: each employee trained, a violation per employee7
1926.20(b)(3)Unsafe equipment tagged, locked out or removed7
1926.20(f)(1)PPE standards: a violation per employee not protected6
1926.21(b)(2)Instruction in recognizing and avoiding unsafe conditions545
1926.21(b)(1)Use of the training programs the Secretary provides5
1926.21(b)(3)Instruction on poisons, caustics and other harmful substances2
1926.21(b)(5)Instruction on flammable liquids, gases and toxic materials2
1926.21(b)(6)(i)Former paragraph, removed from the standard in 2015, still in FY2025 citation data1
1926.21(a)Training programs run by the Secretary1

1926.20: 1,423 citations in FY2025 at 1,181 inspections, 1,368 of them at construction sites (NAICS 23). 1926.21: 556 citations in FY2025 at 551 inspections, 488 of them at construction sites (NAICS 23). Citation items issued Oct 1, 2024 to Sep 30, 2025, counted by HazComFast on U.S. Department of Labor enforcement data (extracted Oct 13, 2026). Inspected establishments, not the whole industry.

Questions about site-specific safety plans

Does OSHA require a site-specific safety plan?

No federal OSHA standard calls for a document by that name. Owners, general contractors and contracts ask for one. What part 1926 does ask is that the employer initiate and maintain the programs needed to comply (29 CFR 1926.20(b)(1)), with frequent and regular inspections of the job sites, materials and equipment by competent persons the employer designates (1926.20(b)(2)). A site-specific plan is a practical way to show both.

What should a site-specific safety plan include?

The project and the people, the emergency details (hospital, assembly point, first aid, extinguishers, contacts), the written programs the work calls for, the activities with their hazards and controls, the competent persons and inspections, the subcontractors, and an orientation sign-off. This template has a section for each.

Which written programs might a construction site need?

Depending on the work: a written hazard communication program with the list of hazardous chemicals (29 CFR 1910.1200(e)(1), applied through 1926.59); a fire protection program for all phases of the work (1926.150(a)(1)); an emergency action plan where a part 1926 standard calls for one (1926.35); a written silica exposure control plan where the silica standard covers the work (1926.1153(g)(1)); and a fall protection plan only for leading edge, precast or residential work under 1926.502(k).

Do I need a fall protection plan for every site?

No. A written fall protection plan under 29 CFR 1926.502(k) is an option only for employees doing leading edge work, precast concrete erection or residential construction who can show conventional fall protection is infeasible or creates a greater hazard. Everywhere else, the site uses conventional fall protection.

What medical arrangements go in the plan?

Provisions for prompt medical attention in case of serious injury are made before the project starts (29 CFR 1926.50(b)). Where no infirmary, clinic, hospital or physician is reasonably accessible, a person with a valid first-aid certificate is available at the worksite (1926.50(c)), and where 911 is not available, the numbers of physicians, hospitals or ambulances are conspicuously posted (1926.50(f)(1)).

Who signs the site-specific safety plan?

OSHA sets no signature for it. Most contractors have the safety manager or the project manager approve it, and have each worker sign that they attended the site orientation. The template has both.

Sources and verification

Verified against the eCFR on Oct 20, 2026 (title 29 current to Oct 16, 2026). State Plan states enforce their own standards, which may go further than the federal ones. Not legal advice.

Emergency action plan builder →Fall protection plan builder →Job hazard analysis builder →All free OSHA tools →