Skip to content

Urgent: Nov 20, 2026 — HCS 2024 Deadline. Get ready →

Free OSHA Tool

Emergency Action & Evacuation Plan Builder (OSHA 1910.38)

Build a site-specific Emergency Action Plan with a section for each of the six 1910.38(c) elements, then download it as a PDF in English or Spanish (your own text prints as you typed it). Anything left blank prints as to be completed, and the PDF is marked draft. No login. A written EAP is required only when an OSHA standard requires one.

Verified vs OSHA sources · 2026-10-05

Free tool, no login. HazComFast app is our paid product.

Plan language:

A written EAP is required only when an OSHA standard requires one (29 CFR 1910.38(b)). An employer with 10 or fewer employees may communicate the plan orally (29 CFR 1926.35(e)(3)). This tool generates a template — verify it against your site-specific hazards; it does not certify compliance.

Facility / Site Information

EAP Coordinators & Designated Contact

Reporting & Alarm System

How an emergency is reported (c)(1) and the distinctive alarm signal (d). Describe what the site really has: anything left blank prints as TO BE COMPLETED BEFORE USE and the PDF is a draft.

Assembly Points

Employee Accountability & Duties

Required elements of 1910.38(c). Leave blank if not applicable to your operation.

Medical Resources On Site

Emergency Procedures

Procedure #1

Special Considerations

This plan is a draft until these are filled in:

  • Designated contact (c)(6)
  • How an emergency is reported (c)(1)
  • Employee alarm signal (d)
  • Evacuation type and assembly point (c)(2)
  • Exit route assignments (c)(2)
  • Headcount after evacuation (c)(4)
  • Critical operations, or 'none' (c)(3)
  • Rescue and medical duties, or 'none' (c)(5)
  • Trained evacuation aides (e)

Where nobody stays behind, or nobody has rescue duties, write "None" with the reason: (c)(3) and (c)(5) still need an answer.

29 CFR 1910.38 (general industry); 29 CFR 1926.35 (construction) 29 CFR 1910.38(c)(1)–(6) 29 CFR 1910.38(d); 1926.35(c) in construction

Free tool. No signup, no account. Want to centralize SDSs and proof? HazComFast (the app) is our paid product.

Next step (recommended)

Brief the crew on the plan you just wrote

Use case: Emergency preparedness

In HazComFast each jobsite gets its own plan, workers see it on their phone, and the plan won't export with a blank left in it.

Related tools

Use these free tools together for a complete HazCom setup:

Need more than free tools? Get inspection-ready SDS management, chemical inventory, and training records with HazComFast—from $69/mo, or start on the free plan.

View plans & start trial

What an OSHA Emergency Action Plan is — and when you need one

An Emergency Action Plan (EAP) is the written document that tells your workers exactly what to do when a fire, chemical release, medical emergency, or severe-weather event happens — how to report it, how to get out, and how the company confirms everyone is safe. The governing standard is 29 CFR 1910.38 for general industry. Construction has its own standard, 29 CFR 1926.35, whose paragraph (b) lists the corresponding elements in a different order.

A written EAP is not universally required. Under 29 CFR 1910.38 (general industry) you must have one only when another OSHA standard requires it (see the trigger table below). When a plan is required, it must be in writing, kept in the workplace, and available to employees (29 CFR 1910.38(b)) — except that an employer with 10 or fewer employees may communicate the plan orally (construction has the identical exception at 29 CFR 1926.35(e)(3)).

The six required elements of 1910.38(c)

Whatever your operation, a compliant EAP must contain these six minimum elements. The builder above maps each input field to one of them so nothing is missed.

#Required elementWhat it must coverCFR
1Reporting an emergencyHow employees report a fire or other emergency (who to call, which alarm to activate).29 CFR 1910.38(c)(1)
2Evacuation procedures & exit routesType of evacuation (total, partial, shelter-in-place) and exit-route assignments.29 CFR 1910.38(c)(2)
3Critical-operations employeesProcedures for employees who stay to shut down critical operations before they evacuate.29 CFR 1910.38(c)(3)
4Employee accountabilityHow you account for every employee after the evacuation (headcount at the assembly point).29 CFR 1910.38(c)(4)
5Rescue & medical dutiesDuties of employees who perform rescue or medical aid before EMS arrives.29 CFR 1910.38(c)(5)
6Designated contactName or job title of every employee who can be contacted for more information.29 CFR 1910.38(c)(6)

Two more duties sit alongside the six elements: you must have and maintain an employee alarm system with a distinctive signal (29 CFR 1910.38(d); 1926.35(c) in construction), and you must designate and train employees to assist in an orderly evacuation (29 CFR 1910.38(e); 1926.35(e)(1) in construction).

Which OSHA standards trigger an EAP?

Because 29 CFR 1910.38 (general industry) only applies “whenever an OSHA standard in this part requires one,” you need an EAP if any of these (among others) apply to your work:

Triggering standardCFR
Portable fire extinguishers — total evacuation policy29 CFR 1910.157(b)(2)
Fixed fire-extinguishing systems29 CFR 1910.160(b)(11)
Process Safety Management of highly hazardous chemicals29 CFR 1910.119(n)
Hazardous waste operations & emergency response (HAZWOPER)29 CFR 1910.120(l) / (q)
Grain handling facilities29 CFR 1910.272(d)
Ethylene oxide — emergency situations (and other expanded-standard substances)29 CFR 1910.1047(h)

In construction, 29 CFR 1926.35(a) applies the same rule to Part 1926: an EAP is required where an employer at a hazardous waste operation evacuates instead of responding (29 CFR 1926.65(l)(1)(ii)), where process safety management applies (29 CFR 1926.64, which applies 1910.119), or where MDA work calls for a written emergency plan (29 CFR 1926.60). The construction fire protection standard, 1926.150, does not require one.

Even where no specific standard names the EAP, planning for foreseeable emergencies can help address the emergency hazards of the work. It does not by itself show compliance with the General Duty Clause or with the fire, exit or substance standards that apply.

Worked examples

Example 1 — a 6-person remodeling crew. With 10 or fewer employees, this employer may communicate the plan orally (29 CFR 1926.35(e)(3)). They still need the same six elements: on a fire alarm (three air-horn blasts), everyone exits to the parking-lot assembly point, the lead counts heads against the daily sign-in sheet, no one re-enters, and the superintendent is the designated contact. Recording it in this builder — even though writing is optional at their size — gives them a posted reference and proof of training.

Example 2 — a 60-employee plant with a boiler. Where an OSHA standard requires this plant to have an EAP, the plan must be written, since it has more than 10 employees (29 CFR 1910.38(b)). A boiler and 60 employees do not by themselves bring the plant under process safety management (29 CFR 1910.119(a) turns on highly hazardous chemicals above threshold quantities). If two operators must stay to shut the boiler down safely before evacuating, the plan includes a (c)(3) procedure for them, a (c)(4) headcount reconciled by department, (c)(5) duties for the trained first-aid/AED responders, exit-route assignments by wing, and the EHS manager as the (c)(6) contact. The distinctive alarm signal is documented under 29 CFR 1910.38(d); 1926.35(c) in construction.

What to do next

  • Build and post the plan. Use the builder above, add a procedure for each emergency your site could face, and download the PDF. Keep a copy in the job trailer and a digital backup.
  • Set up the alarm system. Confirm a distinctive signal that carries above your site's ambient noise (29 CFR 1910.38(d); 1926.35(c) in construction) and that every worker recognizes it.
  • Train evacuation aides. Designate and train the employees who will direct an orderly evacuation (29 CFR 1910.38(e); 1926.35(e)(1) in construction); run a drill and record the date.
  • Review on the triggers. Re-train and update the plan whenever an employee's responsibilities change or the plan changes (29 CFR 1910.38(f); 1926.35(e)(2) in construction). Best practice is an annual review plus a review after any drill or real event.
  • Translate for your crew. If you have Spanish-speaking workers, generate the Spanish version of the plan so everyone can act on it.

Frequently asked questions

Is an Emergency Action Plan required by OSHA?

An EAP is required when any OSHA standard requires one — it is not universally mandated for every employer (29 CFR 1910.38(a); construction 1926.35 introductory text). Standards that trigger it include portable fire extinguishers where employees must evacuate (1910.157), fixed extinguishing systems, hazardous-waste operations (HAZWOPER, 1910.120), process safety management (1910.119), and others. When a plan is required it must be in writing, kept in the workplace, and available to employees (1910.38(b)) — but an employer with 10 or fewer employees may communicate it orally (construction has the identical exception at 1926.35(e)(3)).

What must an Emergency Action Plan include?

Per 1910.38(c) the plan must include six minimum elements: (1) procedures for reporting a fire or other emergency; (2) procedures for emergency evacuation, including the type of evacuation and exit-route assignments; (3) procedures for employees who remain to operate critical operations before they evacuate; (4) procedures to account for all employees after evacuation; (5) rescue and medical duties for those who perform them; and (6) the name or job title of every employee who may be contacted for more information. Separately, 1910.38(d) requires an employee alarm system with a distinctive signal, and 1910.38(e) requires you to designate and train evacuation aides.

What is the difference between an EAP and a Fire Prevention Plan?

They are two separate standards. The Emergency Action Plan (1910.38) governs how people respond to and evacuate during an emergency. The Fire Prevention Plan (1910.39) governs how you keep a fire from starting — listing major fire hazards, ignition-source controls, and the maintenance of fire-control equipment. Some operations need both. This builder produces the EAP; a Fire Prevention Plan is a companion document.

How often must the EAP be reviewed?

OSHA does not set a fixed calendar interval, but 1910.38(f) requires you to review the plan with each employee when the plan is first developed or the employee is first assigned, whenever the employee's responsibilities change, and whenever the plan itself changes. Best practice is an annual review plus a review after every drill or actual emergency, with the review date recorded on the plan.

Do I need to conduct emergency drills?

29 CFR 1910.38 does not itself require drills, and neither does 1910.39. But running evacuation drills is the strongest evidence that your training under 1910.38(e) is effective, and it is a powerful defense in an inspection. Many state plans, local fire codes, and NFPA 101 recommend or require periodic drills — confirm what applies in your jurisdiction.

Does the EAP need an employee alarm system?

Yes. 1910.38(d) in general industry, and 1926.35(c) on a construction site, require the employer to have an employee alarm system. In general industry it uses a distinctive signal for each purpose; on a construction site, a distinctive signal is required for each purpose when the alarm serves more than one (1926.35(c)(1) also refers to an alarm section that Part 1926 does not contain today). On a small jobsite the 'system' can be as simple as an air horn or a radio code word, as long as everyone in the affected area can perceive it above the ambient noise and recognize it as the signal to evacuate, the benchmark of 1910.165(b)(2)-(3). This builder records your alarm method in each procedure and in the dedicated alarm-system section.

Can an EAP be stored electronically, and does it need a Spanish version?

Yes to electronic storage — OSHA allows it provided employees can access the plan during their work shift; for construction a printed copy in the job trailer plus a digital backup is recommended. There is no OSHA rule mandating Spanish, but training and the plan must be understandable to the employees who must act on it, so a Spanish-speaking crew should receive a Spanish version. This builder generates the plan in English or Spanish for that reason.

Sources & verification

EAP facts verified 2026-10-05. This tool generates a template per OSHA 1910.38 / 1926.35 — it does not certify a specific plan as compliant, and it is not legal advice. Failing to have or follow a required EAP can be cited; an uncorrected violation can run up to $16,550/day in failure-to-abate penalties.

Heat illness prevention plan →Confined space permit →Fall protection plan →OSHA fine calculator →Go digital with HazComFast →