In Oregon, a serious violation of 29 CFR 1926.1052 (Stairways (Construction)) carries a maximum penalty of $17,004 per violation in 2026, rising to $170,046 for a willful or repeat violation. Stairways (Construction) is enforced for private construction employers by Oregon OSHA. Oregon sets its own maximums, above the federal baseline.
- Home
- OSHA Penalties by State
- Oregon
- Stairways (Construction)
29 CFR 1926.1052 · Oregon
Stairways (Construction) Requirements in Oregon
Stairways (Construction) in Oregon: 2026 penalties, who enforces 29 CFR 1926.1052, the paragraphs cited and free tools.
Verified vs OSHA sources · 2026-10-19
In FY2025, Oregon OSHA cited 29 CFR 1926.1052 34 times in Oregon construction (1.9% of its construction citations there, the 5th most-cited standard there). The paragraph cited most was 1926.1052(c)(1)(i) with 14 citations.
34
1926.1052 citations in Oregon construction, FY2025
(c)(1)(i)
paragraph cited most in Oregon (14 citations)
5.8
fatal work injuries per 100,000 full-time workers in construction, Oregon, 2024 (BLS)
Oregon 29 CFR 1926.1052 Enforcement, FY2025
Verified · 2026-08-0834
citations of 29 CFR 1926.1052 (FY2025)
$47,344
penalties for this standard
1.9%
of the state's 1,752 construction citations
In FY2025, Oregon OSHA cited 29 CFR 1926.1052 (Stairways (Construction)) 34 times on Oregon construction jobsites with $47,344 in penalties for it (current amounts), about 1.9% of every construction citation the state issued that year. That put it fifth on Oregon's most-cited construction list for FY2025.
Stairways (Construction) in Oregon: real citations and FY2025 totals
Counted · Oct 21, 2026The latest 10 inspections in Oregon with an item under 29 CFR 1926.1052 in the Department of Labor's OSHA enforcement data, every industry, newest first. Each line shows the item of that inspection with the largest current penalty under 29 CFR 1926.1052.
Aug 5, 2026 · INNOVATIVE CONSTRUCTION INC in Happy Valley
1926.1052(c)(1)(ii), serious, $1,214 penalty. Case still open in the data extracted Oct 21, 2026. Recorded by the State Plan's office.
Inspection activity number 349057042 in the Department of Labor data; industry: Foundation, Structure, and Building Exterior Contractors.
Jul 10, 2026 · K&C GENERAL CONSTRUCTION LLC in Beaverton
1926.1052(c)(1)(i), serious, $1,457 penalty. Case still open in the data extracted Oct 21, 2026. Recorded by the State Plan's office.
Inspection activity number 348924499 in the Department of Labor data; industry: Nonresidential Building Construction.
May 18, 2026 · K&C GENERAL CONSTRUCTION LLC in Beaverton
1926.1052(c)(1)(i), serious, $1,214 penalty; 2 items under 29 CFR 1926.1052 in this inspection, $2,428 in current penalties for all of them. Case still open in the data extracted Oct 21, 2026. Recorded by the State Plan's office.
Inspection activity number 348805086 in the Department of Labor data; industry: Foundation, Structure, and Building Exterior Contractors.
Apr 27, 2026 · PRO MOTION'S LLC in The Dalles
1926.1052(c)(1)(i), serious, $1,214 penalty. Case still open in the data extracted Oct 21, 2026. Recorded by the State Plan's office.
Inspection activity number 348840539 in the Department of Labor data; industry: Foundation, Structure, and Building Exterior Contractors.
Mar 26, 2026 · JMJ CONSTRUCTION LLC in Portland
1926.1052(c)(1)(i), serious, $1,214 penalty. Case closed Aug 15, 2026. Recorded by the State Plan's office.
Inspection activity number 348757923 in the Department of Labor data; industry: Foundation, Structure, and Building Exterior Contractors.
Feb 2, 2026 · PARKWAY CONSTRUCTION GP LLC in Bend
1926.1052(c)(1)(i), serious, $1,177 penalty. Case still open in the data extracted Oct 21, 2026. Recorded by the State Plan's office.
Inspection activity number 348474503 in the Department of Labor data; industry: Nonresidential Building Construction.
Jan 28, 2026 · CRISOSTOMO GENERAL CONSTRUCTION LLC in Canby
1926.1052(c)(1)(i), serious, $1,177 penalty. Case still open in the data extracted Oct 21, 2026. Recorded by the State Plan's office.
Inspection activity number 348638768 in the Department of Labor data; industry: Foundation, Structure, and Building Exterior Contractors.
Dec 4, 2025 · NORTHWEST CONSTRUCTION & REMODELING LLC in Portland
1926.1052(c)(1), repeat, $11,769 penalty. Case still open in the data extracted Oct 21, 2026. Recorded by the State Plan's office.
Inspection activity number 348578865 in the Department of Labor data; industry: Foundation, Structure, and Building Exterior Contractors.
Nov 3, 2025 · J & M BUILDERS INC in Sandy
1926.1052(c)(1)(i), other-than-serious, no penalty. Case still open in the data extracted Oct 21, 2026. Recorded by the State Plan's office.
Inspection activity number 348562224 in the Department of Labor data; industry: Foundation, Structure, and Building Exterior Contractors.
Sep 24, 2025 · NORTHWEST CONSTRUCTION & REMODELING LLC in Hillsboro
1926.1052(c)(1), serious, $1,177 penalty. Case still open in the data extracted Oct 21, 2026. Recorded by the State Plan's office.
Inspection activity number 348474917 in the Department of Labor data; industry: Foundation, Structure, and Building Exterior Contractors.
FY2025 in Oregon, every industry
36
citation items under 29 CFR 1926.1052 in 32 inspections
1
items at employers outside construction (35 at construction employers, NAICS 23)
10.7%
of the 335 items under 29 CFR 1926.1052 in the data
From Oct 1, 2024 to Sep 30, 2025, the data record 36 citation items under 29 CFR 1926.1052 at inspected sites in Oregon, in 32 inspections, every industry included. Of the 91 sections of 29 CFR parts 1904, 1910 and 1926 cited in Oregon that year (2,433 citation items in all), 15 drew more items than 29 CFR 1926.1052. By classification: 35 serious, 0 willful, 0 repeat and 1 other-than-serious. All of them were recorded by the State Plan's office. Of the 36 states and territories with items under 29 CFR 1926.1052 in this data, 1 had more than Oregon.
| Paragraph | Items | Share of the 36 |
|---|---|---|
| 1926.1052(c)(1)(i) | 16 | 44% |
| 1926.1052(c)(1)(ii) | 6 | 17% |
| 1926.1052(c)(1) | 6 | 17% |
| 1926.1052(c)(12) | 2 | 6% |
| 1926.1052(c)(4) | 2 | 6% |
9 different paragraphs were cited in all; the table lists the 5 with the most items.
Industry groups with the most items: Foundation, Structure, and Building Exterior Contractors (17); Residential Building Construction (9); Building Finishing Contractors (6). 91% of the 32 inspections with a recorded headcount were at sites with 1 to 10 employees (the headcount of the inspected site, not of the employer).
Quarter by quarter in Oregon
| Quarter | Items |
|---|---|
| FY2025 · Oct to Dec 2024 | 9 |
| FY2025 · Jan to Mar 2025 | 9 |
| FY2025 · Apr to Jun 2025 | 12 |
| FY2025 · Jul to Sep 2025 | 6 |
| FY2026 · Oct to Dec 2025 | 2 |
| FY2026 · Jan to Mar 2026 | 3 |
| FY2026 · Apr to Jun 2026 | 3 |
| FY2026 · Jul to Sep 2026 | 2 |
FY2026 so far: 10 citation items, against 36 in FY2025. FY2026 is still incomplete in the data extracted Oct 21, 2026: the Department of Labor adds citations with a delay.
29 CFR 1926.1052 in the states next to Oregon
Since October 1, 2024, the data record 46 citation items under 29 CFR 1926.1052 in Oregon; in the states next to it, Nevada 3 (2 in FY2025) and Idaho 2 (2 in FY2025), while California and Washington had none. The latest there:
Oct 22, 2025 · QUALITY IRON INC. in Las Vegas, Nevada
1926.1052(b)(2), serious, $2,110 current penalty ($4,220 as first proposed). Case closed Nov 25, 2025. Recorded by the Nevada State Plan office.
Inspection activity number 348287129 in the Department of Labor data; industry: Foundation, Structure, and Building Exterior Contractors.
Sep 18, 2025 · NOLIND & CREW, INC. in Boise, Idaho
1926.1052(c)(1)(ii), serious, $1,447 penalty. Case still open in the data extracted Oct 21, 2026. Recorded by federal OSHA.
Inspection activity number 348467648 in the Department of Labor data; industry: Foundation, Structure, and Building Exterior Contractors.
Mar 4, 2025 · TOUCHSTONE LIVING INC in Las Vegas, Nevada
1926.1052(c)(1)(i), serious, $2,110 current penalty ($4,220 as first proposed). Case closed Apr 1, 2025. Recorded by the Nevada State Plan office.
Inspection activity number 347849655 in the Department of Labor data; industry: Residential Building Construction.
From the Department of Labor's OSHA enforcement data, extracted Oct 21, 2026: deleted items left out, 29 CFR numbers only, placed in the state of the inspected site; establishment names as recorded, shown when they name a business or a public body; penalties as recorded on Oct 28, 2026, and they change when a case is settled or contested. A State Plan office can record an item under a state rule number instead of 29 CFR 1926.1052; only items recorded under the federal number appear here. These are not figures OSHA publishes for the state, and the live database can change them. Same data source and method as our HazCom enforcement study.
What Oregon's own rule says
Oregon adopts the federal stairways section unchanged. Its neighbors changed: in the same Subdivision X, Oregon added OAR 437-003-0065 for extension ladders, and in Subdivision M it repealed the fall-protection sections outright. Stairways is the one where the federal number and the federal duty both still stand.
29 CFR 1926.1052 as adopted (published 8/23/91, FR vol. 56, no. 164)The duty matches the federal text, and the state cites it under the federal number.
Falls and work deaths in Oregon, 2024
Oregon recorded 52 fatal work injuries in 2024, down from 54 in 2023. Falls, slips and trips caused 7 of them (13%). Construction accounted for 8.
Source: BLS Census of Fatal Occupational Injuries, Oregon, 2024
How Oregon Enforces 29 CFR 1926.1052
Oregon runs an OSHA-approved State Plan administered by Oregon OSHA, which ordinarily covers private-sector construction (a few workplaces, such as some federal enclaves, military installations and maritime work, stay under federal OSHA, as the Coverage section of OSHA's page on the plan lists). Its compliance officers enforce Oregon's own standards, which must be at least as effective as federal OSHA's and may go further. On this subject the rule is 29 CFR 1926.1052 as adopted (published 8/23/91, FR vol. 56, no. 164). Oregon OSHA cited 29 CFR 1926.1052 34 times in Oregon construction in FY2025 (OSHA Frequently Cited Standards). Oregon also sets its own civil-penalty maximums, above the federal baseline.
In Oregon, the FY2025 citations under 29 CFR 1926.1052 went most often to Framing Contractors (15) and New Single-Family Housing Construction (except For-Sale Builders) (5). Citing instances separately is a discretionary exception: OSHA's instance-by-instance policy of April 17, 2024 allows it for serious or repeat violations, and other-than-serious recordkeeping violations, where the standard's text allows it.
HazComFast records the state of every jobsite and shows that the Oregon State Plan ordinarily governs it; a location in the state does not settle the exclusions listed in the Coverage section of OSHA's page on the plan. Start free
Help and oversight in Oregon
Free, confidential help: OSHA On-Site Consultation
In Oregon, the program is Oregon OSHA Consultation Services (Department of Consumer & Business Services). OSHA describes it as “Primarily for smaller businesses, no-cost, confidential consultations help employers identify and address hazards and establish or improve safety and health programs.” It is separate from OSHA enforcement; the employer commits to correcting serious hazards.
Sources: osha.gov and the state's official statute site, September 26, 2026.
Oregon Penalty Amounts for 29 CFR 1926.1052 (2026)
Reviewed · 2026-10-19Oregon amounts effective January 1, 2026 (Oregon OSHA Bulletin 1-2026; summary 440-5632, accessed 2026-09-15).
| Violation type | 2026 maximum | Basis |
|---|---|---|
| Serious | $17,004 | Oregon state maximum |
| Willful | $170,046 | Oregon state maximum |
| Repeat | $170,046 | Oregon state maximum |
| Failure to abate | State schedule | Oregon publishes its own failure-to-abate amount in its state schedule |
Oregon OSHA sets its own maximums (ORS 654.086(4), OAR 437-001-0142; adjusted each year by Bulletin 1-2026, effective Jan 1, 2026): serious up to $17,004; willful/repeat up to $170,046. Where a violation caused or contributed to a work-related death, Oregon sets a minimum amount as well as a higher ceiling, and the two differ by violation class: a serious violation carries $21,765 to $54,412, and a repeat or willful violation carries $54,412 to $272,058 (Bulletin 1-2026 penalty tables). A willful or repeat violation that caused or contributed to a death has its own tier: up to $272,058 in 2026 (Bulletin 1-2026). Amounts are ceilings per violation. Oregon OSHA computes proposed penalties under its own State Plan procedures.
Key Stairways (Construction) Requirements 29 CFR 1926.1052
- Install stairs between 30° and 50° from horizontal (1926.1052(a)(2))
- Equip stairways having four or more risers or rising more than 30 inches, whichever is less, with at least one handrail and one stairrail system along each unprotected side or edge (1926.1052(c)(1))
- Stairrails installed after March 15, 1991 are not less than 36 inches from the upper surface of the stairrail system to the surface of the tread; when the top edge also serves as a handrail, it is not more than 37 inches nor less than 36 inches (1926.1052(c)(3)(i), (c)(7))
- Keep riser height and tread depth uniform within each flight of stairs, with variations not over 1/4-inch (1926.1052(a)(3))
- Provide midrails, screens, mesh, intermediate vertical members, or equivalent intermediate structural members between the top rail of the stairrail system and the stairway steps (1926.1052(c)(4))
- Except during stairway construction, allow no foot traffic on pan stairs or skeleton metal stairs unless they are fitted with the temporary treads and landings of 1926.1052(b)(1)-(2)
Who enforces it in Oregon: Oregon OSHA inspects private employers, construction included, under an OSHA-approved State Plan. Oregon's own rule on this subject is 29 CFR 1926.1052 as adopted (published 8/23/91, FR vol. 56, no. 164).
The compliance checklist, the paragraphs OSHA cites nationally and what an inspector checks under 29 CFR 1926.1052 are on the 29 CFR 1926.1052 page.
Most-Cited Stairways (Construction) Paragraphs in Oregon, FY2025
Oregon OSHA issued 34 citations under 29 CFR 1926.1052 to Oregon construction employers in FY2025. The paragraphs cited most, with the official text. A serious violation carries up to $17,004.
- 1
1926.1052(c)(1)(i) 14 citations
“At least one handrail; and”
- 2
1926.1052(c)(1) 6 citations
“Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, shall be equipped with:”
- 3
1926.1052(c)(1)(ii) 6 citations
“One stairrail system along each unprotected side or edge.”
- 4
1926.1052(c)(12) 2 citations
“Unprotected sides and edges of stairway landings shall be provided with guardrail systems. Guardrail system criteria are contained in subpart M of this part.”
- 5
1926.1052(c)(4) 2 citations
“Midrails, screens, mesh, intermediate vertical members, or equivalent intermediate structural members, shall be provided between the top rail of the stairrail system and the stairway steps.”
- 6
1926.1052(b)(2) 1 citation
“Except during stairway construction, foot traffic is prohibited on skeleton metal stairs where permanent treads and/or landings are to be installed at a later date, unless the stairs …”
HazComFast count from the Labor Department's OSHA enforcement data: citations issued in FY2025 to construction employers (NAICS 23), by the paragraph cited. Paragraph text: eCFR, current as of September 24, 2026. data.dol.gov
Oregon Safety & Enforcement Profile
1,752
FY2025 construction citations
Oregon OSHA
Enforces private construction
- Construction trades inspected most in Oregon, FY2025: Roofing Contractors (264), New Single-Family Housing Construction (except For-Sale Builders) (246) and Commercial and Institutional Building Construction (81), out of 1,207 inspections opened (federal OSHA and State Plan combined).
- Cited most under 29 CFR 1926.1052 in Oregon, FY2025: Framing Contractors (15), New Single-Family Housing Construction (except For-Sale Builders) (5) and Drywall and Insulation Contractors (3), of 34 citations.
- Construction fatality rate in Oregon, 2024: 5.8 per 100,000 full-time workers, 40th highest of the 40 states BLS published (all industries: 2.6).
- Oregon OSHA's permanent heat illness prevention rule, OAR 437-002-0156, took effect June 15, 2022. It is triggered when the heat index equals or exceeds 80°F, indoors or outdoors. (OAR 437-002-0156(1) and its history note (OSHA 3-2022))
HazComFast count from the Labor Department's OSHA enforcement data: inspections of construction employers (NAICS 23) opened from October 1, 2024 to September 30, 2025, federal OSHA and State Plan combined, grouped by the inspected employer's 2022 NAICS industry. HazComFast count from the Labor Department's OSHA enforcement data: citations issued in FY2025 to construction employers (NAICS 23), grouped by the cited employer's 2022 NAICS industry. Industry names are the Census Bureau's 2022 NAICS titles. data.dol.gov · BLS fatality rates by state, 2024
Free Stairways (Construction) Compliance Tools
Stairways (Construction) FAQ for Oregon
What are the penalties for 29 CFR 1926.1052 violations in Oregon in 2026?
In Oregon, a serious violation of 29 CFR 1926.1052 carries a maximum penalty of $17,004 per violation, and a willful or repeat violation up to $170,046. Oregon sets its own maximums, above the federal baseline. Oregon OSHA sets its own maximums (ORS 654.086(4), OAR 437-001-0142; adjusted each year by Bulletin 1-2026, effective Jan 1, 2026): serious up to $17,004; willful/repeat up to $170,046. Where a violation caused or contributed to a work-related death, Oregon sets a minimum amount as well as a higher ceiling, and the two differ by violation class: a serious violation carries $21,765 to $54,412, and a repeat or willful violation carries $54,412 to $272,058 (Bulletin 1-2026 penalty tables). A willful or repeat violation that caused or contributed to a death has its own tier: up to $272,058 in 2026 (Bulletin 1-2026). (Source: ORS 654.086(4) + OAR 437-001-0142; verified 2026-10-19.)
Which Oregon construction trades are cited most under Stairways (Construction)?
In FY2025, Oregon OSHA issued 34 citations under 29 CFR 1926.1052 to Oregon construction employers, most often to Framing Contractors (15), New Single-Family Housing Construction (except For-Sale Builders) (5) and Drywall and Insulation Contractors (3) (HazComFast count from Labor Department enforcement data, by the cited employer's NAICS industry). Oregon OSHA inspects these employers directly and may apply requirements beyond the federal standard. For context, Oregon OSHA issued 1,752 construction citations across 729 inspections in FY2025. On a jobsite, the standard on this subject is 29 CFR 1926.1052.
How often is Stairways (Construction) cited on Oregon jobsites?
In FY2025, Oregon's state plan (Oregon OSHA) issued 1,752 construction citations across 729 inspections (OSHA Frequently Cited Standards, NAICS 23). Oregon's fatality figures are shown above.
When does Oregon OSHA require handrails on a construction stairway?
Under 29 CFR 1926.1052(c)(1), a stairway with four or more risers, or rising more than 30 inches, whichever is less, must have at least one handrail and a stairrail system along each unprotected side or edge. In Oregon these are enforced by Oregon OSHA, which cited 1926.1052 34 times in FY2025 construction.
Who enforces stairway rules (1926.1052) in Oregon?
Oregon OSHA (OR-OSHA), a division of the Department of Consumer and Business Services. Oregon runs a full OSHA-approved State Plan, so a state compliance officer inspects and cites 1926.1052 on private jobsites.
Can I get free OSHA help in Oregon without an inspection?
Yes. OSHA's On-Site Consultation Program in Oregon is Oregon OSHA Consultation Services (Department of Consumer & Business Services). OSHA describes it this way: "Primarily for smaller businesses, no-cost, confidential consultations help employers identify and address hazards and establish or improve safety and health programs." Consultations are separate from OSHA enforcement, and the employer commits to correcting serious hazards.
How often does Oregon cite 29 CFR 1926.1052 in construction?
In FY2025, Oregon OSHA cited 29 CFR 1926.1052 (Stairways (Construction)) 34 times on Oregon construction jobsites, with $47,344 in penalties for that standard alone (current amounts), about 1.9% of the 1,752 construction citations the state issued that year. (Source: OSHA Frequently Cited Standards, NAICS 23; verified 2026-08-08.)
Stairways (Construction) Guides & Resources
Compare this combination against any other state and standard with the enforcement risk lookup.
Related standards
Stairways (Construction) in Other States
6 other state plans write a rule of their own for 29 CFR 1926.1052 rather than adopting the federal text unchanged. Those are listed first. Compare all of them side by side.
Other OSHA Standards in Oregon
Sources & verification
Penalty amounts and plan-type data were checked on 2026-10-19 against eCFR, OSHA.gov, and the Federal Register. This page is informational and not legal advice; consult the enforcing agency or counsel for your specific situation.
Get the Binder in Order Before the Inspector Arrives. Are You Ready?
OSHA inspections come unannounced, apart from the few exceptions listed in 29 CFR 1903.6. Get the binder in order before the opening conference, not during it.
Serious violation, Oregon
$17,004
per violation (max)
HazComFast Pro
$199/mo
10 jobsites, unlimited chemicals, unlimited workers
New sign-ups are paused. The free tools below need no account, and customers can log in as usual.
Your account keeps working as usual. Cancel anytime.