An Employee Went Home With Their Lock Still On. Who Can Remove It?
The spare key in the supervisor's desk doesn't settle it. 1910.147(e)(3) allows removal under the employer's direction with a written procedure, a verified absence, every reasonable effort to reach the employee, and their knowledge before they resume work.

Does OSHA Require a Lockout/Tagout Log?
1910.147 asks for three records: written procedures, a periodic inspection certification and a training certification. A log of every lock is a shipyard rule under 1915.89. What to keep, and what a lockout register is good for.

How Often Must You Update a Written Safety Program? A Standard-by-Standard Table
Two OSHA programs have an annual review: bloodborne pathogens and construction silica. The others change when the work changes. A table, standard by standard, separating the written plan from training and inspection dates.

Does OSHA Lockout/Tagout (1910.147) Apply to Construction? The Surprising Answer
No. 29 CFR 1910.147 expressly excludes construction at 1910.147(a)(1)(ii). Construction hazardous-energy control instead runs on 1926.417, 1926.702(j), Subpart V, 1926.20/.21, and the General Duty Clause. This is how to build the right program.

Lockout/Tagout (LOTO) Complete Guide: Energy Control for General Industry & Construction
A complete guide to lockout/tagout under 29 CFR 1910.147, and what carries over to construction, where 1926.417 applies instead. Covers 6 energy types, group LOTO, periodic inspections, and the citation traps. Includes a free LOTO Procedure Generator.

Near Miss Reporting, JHA & LOTO: Proactive Safety That Prevents Incidents
How near miss reporting, Job Hazard Analysis, and Lockout/Tagout programs work together to prevent construction injuries before they happen.