At a glance
- 5 meetings for December, each linked to a full toolbox talk with a PDF and a sign-in sheet.
- A HazComFast proposal, not an OSHA calendar. Move the meetings to the weeks when the work happens.
- The PDF and Word plan repeat the meetings and add a follow-up sheet for the actions raised.
December can pack deadlines, holidays and cold into a few weeks. January's plan starts from the route the crew walks in the morning; December's starts from the site as the crew leaves it: the heaters, the temporary power, the dark walkways, the last trips of the year, and the shutdown before the break.
Where December is mild, keep the shutdown and restart sessions and swap the heater session for one of the vehicle talks.
The December meetings
Meeting 1 · about 5 minutes
Heaters before the break
- Objective
- Every heater has the fresh air it needs while it runs, and is turned off or checked before the site closes.
- Activity
- List every heater and generator on site, with the person who turns each one off, or checks it, before the break.
- Ask the crew
- Which heaters will run while the site is closed, if any, and who checks them?
- Check afterward
- Each heater has a named person, and none is left running without a plan.
Meeting 2 · about 5 minutes
Temporary power
- Objective
- Cords and temporary power are checked, and what is not needed over the break is unplugged.
- Activity
- Walk the temporary power with the electrician: cords, GFCIs, panels, and what stays energized over the break.
- Ask the crew
- What stays powered while the site is closed, and why?
- Check afterward
- Cords not needed over the break are unplugged and stored.
Meeting 3 · about 5 minutes
Dark walkways
- Objective
- Walkways and stairs are lit and clear of ice when the crew arrives and leaves in the dark.
- Activity
- Check the lighting on walkways and stairs at the hour the crew arrives or leaves.
- Ask the crew
- Which part of our route is dark when we arrive or leave?
- Check afterward
- Dark spots get lighting, or the crew uses another route.
Meeting 4 · about 5 minutes
The last trips of the year
- Objective
- Trips between sites and home before the holidays are planned for weather and fatigue, with the phone down.
- Activity
- Plan the last trips of the year: who drives, when, and what happens if the roads are bad.
- Ask the crew
- If the roads are bad on the last day, who decides that the crew stays put?
- Check afterward
- Each trip plan names a driver and the person who decides in bad weather.
Optional meeting · about 8 minutes
Closing the site and opening it again
- Objective
- The site is left safe for the break, and a named person checks it before work restarts.
- Activity
- Write the closing list with the crew: materials secured, openings covered, heaters and power handled, fuel stored. Name the person who walks the site before work restarts.
- Ask the crew
- Who walks the site before anyone starts work after the break?
- Check afterward
- The closing list is done, and the restart check is assigned to a named person.
Before the first meeting
- Set the closing date and the restart date.
- Write the closing list with the crew.
- Name the person who does the restart check.
- List the heaters and the temporary power that stay on, if any.
Keep a record of each meeting with the free safety meeting sign-in sheet. A signature shows who was there, not what each person understood, so the check after each meeting matters as much as the signatures.
Other talks that fit December
The rest of the year
Each month has its own plan. The monthly safety topics page shows the whole year on one page, and the safety topics library has every toolbox talk by hazard, trade and season.
In a State Plan state, the state's own standard applies, and it can be stricter than the federal rule. Not legal advice.