What this covers
Planning the work before it starts is where most incidents are prevented. A job hazard analysis breaks a task into steps and controls; pre-task cards put that in the crew's hands daily; and standards mandate written plans for fall protection, emergencies, and heat. Construction fall protection triggers at 6 feet (1926.501). This pack covers the JHA, pre-task/STA, fall, emergency, heat, and crane lift plans.
Use these tools in order
Each tool is free—no login. Work top to bottom for a complete result.
- 1
job-hazard-analysis-builder
Break a task into steps and build a printable JHA/AHA with hazards, controls, PPE, and competent-person sign-off (OSHA recommended practice, Pub 3071).
- 2
pretask-plan-generator
Generate a daily pre-task / safe-task-analysis card: task, hazards, controls, PPE, and crew sign-off for the morning huddle.
- 3
fall-protection-plan-builder
Select work types to get OSHA fall protection requirements. Download a customized plan PDF.
- 4
fall-clearance-calculator
How much clearance a fall arrest system needs below the surface — checked against the 6 ft free-fall and 3.5 ft deceleration limits.
- 5
ladder-safety-selector
The 4:1 set-back, working length, angle and 3 ft rail extension, plus the OSHA rules for your ladder type.
- 6
trench-protective-system-selector
OSHA maximum allowable slope by soil type, the cut-back and top width, and every Subpart P duty that applies at your depth.
- 7
emergency-action-plan-builder
Build a site-specific Emergency Action Plan per OSHA 1910.38. Cover fire, spill, medical, and weather emergencies. Free PDF.
- 8
Heat Illness Prevention Builder
Build an OSHA-aligned heat illness prevention plan. Water, rest, shade for 2026.
- 9
crane-lift-plan-calculator
Calculate crane load utilization, identify critical lifts per OSHA 1926.1417, and generate a professional lift plan PDF.
Frequently asked questions
At what height is fall protection required?
In construction, generally at 6 feet above a lower level (1926.501). In general industry the trigger is 4 feet (1910.28). Different triggers apply for scaffolds, steel erection, and other specific work.
When is a written emergency action plan required?
When another OSHA standard requires it (for example certain HazWaste, process safety, or fixed-extinguisher scenarios). An EAP must cover evacuation routes, reporting, and accounting for employees; if you have 10 or fewer employees you may communicate it orally.
Is there a federal OSHA heat standard?
There is no separate heat-illness standard yet — heat hazards are currently enforced under the General Duty Clause, and OSHA has a proposed rule in progress. Several state plans (e.g., California) already have specific heat requirements.
Planning aids only — not legal advice. Confirm every determination against the current OSHA standard and your State-Plan's rules.
Keep it all in one place
HazComFast centralizes your SDSs, labels, and training proof, and loads each jobsite's SDS onto the crew's phones.
Try HazComFast freeGet the Binder in Order Before the Inspector Arrives. Are You Ready?
OSHA does not give advance notice of inspections (29 CFR 1903.6). Get the binder in order before the opening conference, not during it.
Serious Violation
$16,550
per violation (max)
HazComFast Pro
$199/mo
10 jobsites, unlimited chemicals, unlimited workers
New sign-ups are paused. The free tools below need no account, and customers can log in as usual.
Your account keeps working as usual. Cancel anytime.