Trench Protective System Selector

Enter the soil class and depth to get the OSHA maximum allowable slope, the cut-back per side, the excavation's top width, and every Subpart P duty that kicks in — egress, spoil set-back, atmospheric testing, daily inspection. No login.

Verified vs OSHA sources · 2026-10-05

Free tool — no login. HazComFast app is our paid product.

Classification is a competent-person call using the tests in 29 CFR 1926 Subpart P App. A. When in doubt, the safer class governs.

Pick the soil classification and enter the depth to get the maximum allowable slope, the cut-back, the top width, and every Subpart P duty that applies — each with its CFR paragraph.

A trench is a daily-inspection standard

Subpart P does not ask for one plan — it asks for a competent person’s inspection every day and whenever conditions change. HazComFast keeps those daily inspections, the competent-person designation, and the atmospheric tests in one dated record instead of a notebook in a truck.

Free tool — no signup, no account. Want to centralize SDSs and proof? HazComFast (the app) is our paid product.

Next step (recommended)

Break the dig into steps, hazards, and controls

Use case: Excavation

Learn more

Trenching & Excavation Safety: OSHA Requirements

Related tools

Plan the dig:

Need more than free tools? Get inspection-ready SDS management, chemical inventory, and training records with HazComFast—from $69/mo, or start on the free plan.

View plans & start trial

This tool provides general information and is not legal advice.

A cubic yard of soil weighs about as much as a car

Cave-ins are the reason Subpart P exists: a trench wall gives way in seconds and there is no outrunning it. OSHA’s answer is a protective system — sloping, benching, shoring, or shielding — and 29 CFR 1926.652(a)(1) requires one for every employee in an excavation, except where the dig is entirely in stable rock, or is under 5 ft deep and a competent person examines the ground and finds no indication of a potential cave-in. Shallow is not automatically safe; it is a judgment someone has to make and own.

Table B-1: the maximum allowable slopes

Soil or rock typeMax slope (H:V)Angle from horizontal
Stable rockVertical90°
Type A soil3/4:153°
Type B soil1:145°
Type C soil1½:134°
Type A — short term
12 ft or less, open 24 hours or less
1/2:163°

Sloping or benching for an excavation deeper than 20 ft must be designed by a registered professional engineer. Table B-1 stops being a sufficient answer at that depth.

Why sloping often loses to a trench box

The cut-back is the depth times the ratio, on each side. A 6 ft trench in Type C soil (1½:1) needs 9 ft of cut-back per side — a 3 ft trench bottom becomes 21 ft wide at the top. In a street, between utilities, or inside a property line, that space usually does not exist, which is why shoring or a manufactured trench shield is the common answer. Shields and shoring are governed by the manufacturer’s tabulated data, which must be on site.

The duties that come with the hole

  • Egress — a ladder, stairway or ramp within 25 ft of lateral travel in any trench 4 ft or deeper 29 CFR 1926.651(c)(2)
  • Spoil set-back — materials and equipment kept at least 2 ft from the edge 29 CFR 1926.651(j)(2)
  • Atmosphere — tested before entry in excavations over 4 ft where a hazardous atmosphere could reasonably exist 29 CFR 1926.651(g)(1)(i)
  • Daily inspection — of the excavation, adjacent areas and protective systems, by a competent person, before work starts and as conditions change 29 CFR 1926.651(k)(1)

Frequently asked questions

When does OSHA require a trench protective system?

29 CFR 1926.652(a)(1) requires each employee in an excavation to be protected from cave-ins by an adequate protective system, except when the excavation is made entirely in stable rock, or is less than 5 feet deep and examination of the ground by a competent person provides no indication of a potential cave-in. Note what that means: under 5 feet is not automatically exempt — it takes a competent person's examination.

What are OSHA's maximum allowable slopes?

Table B-1 of Appendix B to Subpart P sets them by soil type: stable rock may be vertical (90°); Type A is 3/4:1, or 53° from horizontal; Type B is 1:1, or 45°; and Type C is 1½:1, or 34°. A short-term option lets Type A excavations 12 feet or less that stay open 24 hours or less be sloped at 1/2:1 (63°). Sloping or benching for any excavation deeper than 20 feet must be designed by a registered professional engineer.

How far back do I have to cut the slope?

Multiply the depth by the soil's horizontal-to-vertical ratio. Type C soil at 1½:1 in a 6-foot trench means cutting back 9 feet on each side, so a 3-foot-wide trench bottom becomes 21 feet wide at the top. Type A at 3/4:1 in the same trench cuts back 4.5 feet per side. That arithmetic is why shoring or a trench shield is often chosen instead of sloping — there simply isn't room in a street or between utilities.

Does a trench need a ladder?

Yes, at 4 feet. 29 CFR 1926.651(c)(2) requires a stairway, ladder, ramp or other safe means of egress in trench excavations that are 4 feet or more in depth, positioned so no worker travels more than 25 feet laterally to reach it. In practice that means moving the ladder as the trench advances, not leaving one at the end.

Who classifies the soil?

A competent person, using the visual and manual tests in Appendix A to Subpart P. The classification is a judgment about the actual material on site — Type A requires cohesive soil at 1.5 tsf or greater and is ruled out where the soil is fissured, subject to vibration from traffic or pile driving, previously disturbed, or part of a layered system dipping into the excavation at 4H:1V or steeper. Type C covers submerged soil or soil from which water is freely seeping. This tool applies the classification you enter; it cannot verify it.

Sources & verification

Slopes, depths and duties verified against osha.gov on 2026-10-05. Soil classification is a competent-person determination made with the tests in Appendix A; this tool applies the classification you enter and does not verify it. General guidance, not legal advice. State-Plan states may impose additional requirements.