A cubic yard of soil weighs about as much as a car
Cave-ins are the reason Subpart P exists: a trench wall gives way in seconds and there is no outrunning it. OSHA’s answer is a protective system — sloping, benching, shoring, or shielding — and 29 CFR 1926.652(a)(1) requires one for every employee in an excavation, except where the dig is entirely in stable rock, or is under 5 ft deep and a competent person examines the ground and finds no indication of a potential cave-in. Shallow is not automatically safe; it is a judgment someone has to make and own.
Table B-1: the maximum allowable slopes
| Soil or rock type | Max slope (H:V) | Angle from horizontal |
|---|---|---|
| Stable rock | Vertical | 90° |
| Type A soil | 3/4:1 | 53° |
| Type B soil | 1:1 | 45° |
| Type C soil | 1½:1 | 34° |
| Type A — short term 12 ft or less, open 24 hours or less | 1/2:1 | 63° |
Sloping or benching for an excavation deeper than 20 ft must be designed by a registered professional engineer. Table B-1 stops being a sufficient answer at that depth.
Why sloping often loses to a trench box
The cut-back is the depth times the ratio, on each side, at the steepest slope the table allows. A 6 ft trench in Type C soil (1½:1) needs at least 9 ft of cut-back per side, so a 3 ft trench bottom becomes at least 21 ft wide at the top. The actual slope may not be steeper than the table, and it has to be gentler when there are signs of distress or when spoil, equipment or traffic near the edge add load; a competent person decides how much gentler 29 CFR 1926 Subpart P App. B (c)(3). In a street, between utilities, or inside a property line, that space usually does not exist, which is why shoring or a manufactured trench shield is the common answer. Support and shield systems come from one of the four options in 1926.652(c): Appendices A, C and D, the manufacturer’s tabulated data, other tabulated data approved by a registered professional engineer, or a design by one. With a manufactured shield the manufacturer’s data and limits govern, and a copy stays at the jobsite while the system is built.
The duties that depend on depth
- Egress: a ladder, stairway or ramp within 25 ft of lateral travel in any trench 4 ft or deeper 29 CFR 1926.651(c)(2)
- Spoil and equipment: kept at least 2 ft from the edge, or held back by retaining devices sufficient to stop them from falling or rolling into the excavation, or both 29 CFR 1926.651(j)(2)
- Atmosphere: tested before entry in excavations over 4 ft where oxygen deficiency or a hazardous atmosphere exists or could reasonably be expected to exist 29 CFR 1926.651(g)(1)(i)
- Inspection: of the excavation, the adjacent areas and the protective systems, by a competent person, daily before work starts, as needed through the shift and after every rainstorm or other event that increases the hazard, whenever employee exposure can reasonably be anticipated 29 CFR 1926.651(k)(1)
Other conditions bring other duties
The form asks for the soil class, the depth and the bottom width, so the list above is the part of Subpart P that depends on them. The duties below depend on what else is at the site. Check them against the excavation in front of you; they are not triggered by the numbers entered.
| Condition at the site | Duty | CFR |
|---|---|---|
| Utilities or other installations may be underground | Estimate where they are before the excavation is opened, ask the owners to locate them, find the exact location by safe means as the work approaches, and protect, support or remove them while the excavation is open. | 29 CFR 1926.651(b) |
| Water is in the excavation or is accumulating (rain, groundwater, runoff) | No one works in accumulated or accumulating water unless adequate precautions are taken, such as special support or shield systems, water removal or a harness and lifeline. Water-removal equipment is monitored by a competent person. | 29 CFR 1926.651(h) |
| Buildings, walls, sidewalks or pavement are near the excavation | Provide shoring, bracing or underpinning where their stability is endangered. Do not excavate below the base or footing of a foundation or retaining wall where that could hazard employees, unless a support system is provided, the excavation is in stable rock, or a registered professional engineer has approved it. Do not undermine sidewalks or pavement without support or other protection. | 29 CFR 1926.651(i) |
| Lifting or digging equipment handles loads, or trucks are loaded or unloaded beside the excavation | No one is permitted underneath loads handled by lifting or digging equipment. Employees stand away from a vehicle being loaded or unloaded. | 29 CFR 1926.651(e) |
| Mobile equipment works next to the edge and the operator cannot see it clearly | Use a warning system such as barricades, hand or mechanical signals, or stop logs. | 29 CFR 1926.651(f) |
| Employees are exposed to public vehicular traffic | Provide and wear warning vests or other garments marked with or made of reflectorized or high-visibility material. | 29 CFR 1926.651(d) |
| Oxygen deficiency or another hazardous atmosphere exists or may develop, at any depth | Take precautions against exposure (respiratory protection or ventilation), keep a flammable gas under 20 percent of its lower flammable limit, and test as often as needed when controls are used. Keep emergency rescue equipment readily available, and attended when in use. | 29 CFR 1926.651(g)(1)(ii) to (iv) and (g)(2) |
| Loose rock or soil could fall or roll from the face of the excavation | Scale the face, install protective barricades at intervals, or use other means that give equivalent protection. | 29 CFR 1926.651(j)(1) |
| Employees or equipment cross over the excavation | Provide walkways, with guardrails that comply with 1926.502(b) where the walkway is 6 feet or more above a lower level. | 29 CFR 1926.651(l) |
| Trees, poles, pipes or other surface encumbrances create a hazard | Remove or support them as necessary to safeguard employees. | 29 CFR 1926.651(a) |
| Spoil, equipment or traffic sit near the edge of a slope, or the slope shows signs of distress | The actual slope is gentler than the maximum allowable slope: at least 1/2H:1V gentler where there are signs of distress, and by an amount a competent person sets where surcharge loads are present. | 29 CFR 1926 Subpart P App. B (c)(3) |
| People work on the face of a sloped or benched excavation above other people | Not permitted unless the employees at the lower level are adequately protected from falling, rolling or sliding material or equipment. | 29 CFR 1926.652(f) |
| A shield or support system is installed, used, moved or removed | Materials free from damage, used as the manufacturer specifies, members connected, removal from the bottom up, no one inside a shield while it is installed, removed or moved vertically, and manufacturer's data at the jobsite while the system is built. | 29 CFR 1926.652(c)(2), (d), (e) and (g) |
Frequently asked questions
When does OSHA require a trench protective system?
29 CFR 1926.652(a)(1) requires each employee in an excavation to be protected from cave-ins by an adequate protective system, except when the excavation is made entirely in stable rock, or is less than 5 feet deep and examination of the ground by a competent person provides no indication of a potential cave-in. Note what that means: under 5 feet is not automatically exempt — it takes a competent person's examination.
What are OSHA's maximum allowable slopes?
Table B-1 of Appendix B to Subpart P sets them by soil type: stable rock may be vertical (90°); Type A is 3/4:1, or 53° from horizontal; Type B is 1:1, or 45°; and Type C is 1½:1, or 34°. A short-term option lets Type A excavations 12 feet or less that stay open 24 hours or less be sloped at 1/2:1 (63°). Sloping or benching for any excavation deeper than 20 feet must be designed by a registered professional engineer.
How far back do I have to cut the slope?
Multiply the depth by the soil's horizontal-to-vertical ratio. Type C soil at 1½:1 in a 6-foot trench means cutting back at least 9 feet on each side, so a 3-foot-wide trench bottom becomes at least 21 feet wide at the top. Type A at 3/4:1 in the same trench cuts back at least 4.5 feet per side. Those are the figures at the steepest slope the table allows: the actual slope may not be steeper, and it has to be gentler when there are signs of distress or when spoil, equipment or traffic near the edge add load (Appendix B (c)(3)). That arithmetic is why shoring or a trench shield is often chosen instead of sloping: there simply isn't room in a street or between utilities.
Does a trench need a ladder?
Yes, at 4 feet. 29 CFR 1926.651(c)(2) requires a stairway, ladder, ramp or other safe means of egress in trench excavations that are 4 feet or more in depth, positioned so no worker travels more than 25 feet laterally to reach it. In practice that means moving the ladder as the trench advances, not leaving one at the end.
Who classifies the soil?
A competent person, using the visual and manual tests in Appendix A to Subpart P. The classification is a judgment about the actual material on site — Type A requires cohesive soil at 1.5 tsf or greater and is ruled out where the soil is fissured, subject to vibration from traffic or pile driving, previously disturbed, or part of a layered system dipping into the excavation at 4H:1V or steeper. Type C covers submerged soil or soil from which water is freely seeping. This tool applies the classification you enter; it cannot verify it.
Sources & verification
- 29 CFR 1926.652 — requirements for protective systems
- 29 CFR 1926.651 — specific excavation requirements
- Subpart P Appendix B — sloping and benching (Table B-1)
Slopes, depths and duties verified against osha.gov on 2026-10-19. Soil classification is a competent-person determination made with the tests in Appendix A; this tool applies the classification you enter and does not verify it. General guidance, not legal advice. State-Plan states may impose additional requirements.
Excavation Safety hub →Trenching & excavation guide →Competent-person requirements →Construction Safety hub →Job Hazard Analysis →