What 29 CFR 1926.701 requires (plain English)
29 CFR 1926.701 sets the general requirements for concrete construction. The subjects are construction loads (a), protruding reinforcing steel (b), post-tensioning (c), riding concrete buckets (d), working under loads (e) and personal protective equipment for pneumatic application (f).
Under (a), no construction loads may be placed on a concrete structure or portion of a structure unless the employer determines, based on information from a person qualified in structural design, that it can support the loads. Beyond that, all protruding reinforcing steel onto and into which employees could fall is guarded to eliminate the hazard of impalement; no employee, except those essential to the post-tensioning operations, is behind the jack during tensioning, and signs and barriers limit access to the post-tensioning area; no employee rides concrete buckets; no employee works under concrete buckets while they are being elevated or lowered into position, and elevated buckets are routed to the extent practical so that no employee or the fewest employees are exposed; and no employee applies a cement, sand and water mixture through a pneumatic hose unless wearing protective head and face equipment. Bull floats and troweling machines are in 1926.702.
1926.701 works with the formwork and shoring standard (1926.703), the concrete equipment standard (1926.702), and the fall-protection and silica standards, since concrete cutting and finishing also generate respirable silica. The silica standard 1926.1153 sets a PEL of 50 µg/m³ as an 8-hour average and, through its Table 1, an alternative of specified exposure control methods for listed tasks; not every wet finishing task generates the same dust.