What 29 CFR 1926.1101 requires (plain English)
29 CFR 1926.1101 applies to asbestos exposure in construction work: demolition or salvage of structures where asbestos is present, removal or encapsulation of asbestos-containing material, construction, alteration, repair, maintenance or renovation of structures that contain asbestos, installation of asbestos products, asbestos spill cleanup, and the transport, disposal, storage and housekeeping of asbestos on the construction site (1926.1101(a)). It does not apply to asbestos-containing asphalt roof coatings, cements and mastics.
The limits are the same as in general industry: 0.1 fiber per cubic centimeter as an 8-hour time-weighted average and 1.0 f/cc averaged over 30 minutes (1926.1101(c)). What is particular to construction is the classification of the work. Class I is the removal of thermal system insulation (TSI) and surfacing material that contains or is presumed to contain asbestos; Class II is the removal of other asbestos-containing material such as wallboard, floor tile, roofing, siding and mastics; Class III is repair and maintenance where that material is likely to be disturbed; Class IV is maintenance and custodial work that touches it without disturbing it, and cleanup after Class I, II and III work (1926.1101(b)).
Class I, II and III work is done inside a regulated area (1926.1101(e)(1)). A competent person assesses exposure immediately before or at the start of each operation (1926.1101(f)(2)(i)); daily monitoring is required on Class I and II work unless a negative exposure assessment covers the whole operation (1926.1101(f)(3)(i)). Wet methods, HEPA vacuums and prompt cleanup apply to every covered operation (1926.1101(g)(1)), and four practices are prohibited whatever the measured level (1926.1101(g)(3)). Training runs before or at initial assignment and at least annually (1926.1101(k)(9)(ii)), and medical surveillance covers workers on Class I, II and III work, or exposed at or above a PEL, for 30 or more days a year (1926.1101(m)(1)(i)(A)).