Skip to content

Approaching: Feb 1, 2027 — 300A Posting Begins. Get ready →

29 CFR 1926.451 · Nevada

Scaffolding Requirements in Nevada

Scaffolding in Nevada: 2026 penalties, who enforces 29 CFR 1926.451, the paragraphs cited and free tools.

Verified vs OSHA sources · 2026-10-19

NevadaConstruction (29 CFR 1926)State Plan: Nevada Occupational Safety and Health Administration (NV OSHA)

In Nevada, a serious violation of 29 CFR 1926.451 (Scaffolding) carries a maximum penalty of $16,550 per violation in 2026, rising to $165,514 for a willful or repeat violation. Scaffolding is enforced for private construction employers by Nevada Occupational Safety and Health Administration (NV OSHA).

In FY2025, Nevada Occupational Safety and Health Administration (NV OSHA) cited 29 CFR 1926.451 20 times in Nevada construction (6.3% of its construction citations there, the 2nd most-cited standard there). The paragraph cited most was 1926.451(f)(3) with 9 citations.

20

1926.451 citations in Nevada construction, FY2025

(f)(3)

paragraph cited most in Nevada (9 citations)

7.9

fatal work injuries per 100,000 full-time workers in construction, Nevada, 2024 (BLS)

Nevada 29 CFR 1926.451 Enforcement, FY2025

Verified · 2026-08-08

20

citations of 29 CFR 1926.451 (FY2025)

$81,971

penalties for this standard

6.3%

of the state's 319 construction citations

In FY2025, Nevada Occupational Safety and Health Administration (NV OSHA) cited 29 CFR 1926.451 (Scaffolding) 20 times on Nevada construction jobsites with $81,971 in penalties for it (current amounts), about 6.3% of every construction citation the state issued that year. That put it second on Nevada's most-cited construction list for FY2025.

Source: OSHA Frequently Cited Standards (NAICS 23, FY2025)

Scaffolding in Nevada: real citations and FY2025 totals

Counted · Oct 21, 2026

The latest 10 inspections in Nevada with an item under 29 CFR 1926.451 in the Department of Labor's OSHA enforcement data, every industry, newest first. Each line shows the item of that inspection with the largest current penalty under 29 CFR 1926.451.

  • Jul 16, 2026 · JT THORPE INDUSTRIAL, INC. in Sparks

    1926.451(f)(15), serious, $4,925 current penalty ($7,035 as first proposed). Case closed Sep 9, 2026. Recorded by the State Plan's office.

    Inspection activity number 348914789 in the Department of Labor data; industry: Building Finishing Contractors.

  • Jul 16, 2026 · TESLA MOTORS NV, INC. in Sparks

    1926.451(f)(15), serious, $10,641 penalty. Case still open in the data extracted Oct 21, 2026. Recorded by the State Plan's office.

    Inspection activity number 348708389 in the Department of Labor data; industry: Other Electrical Equipment and Component Manufacturing.

  • Nov 6, 2025 · INTELLIGENT FIRE SYSTEMS & SOLUTIONS in Sparks

    1926.451(b)(2), other-than-serious, no penalty. Case closed Dec 30, 2025. Recorded by the State Plan's office.

    Inspection activity number 348306515 in the Department of Labor data; industry: Building Equipment Contractors.

  • Oct 9, 2025 · SOUTHERN NEVADA DRYWALL SYSTEMS LLC in Las Vegas

    1926.451(h)(1), serious, $2,873 current penalty ($5,745 as first proposed); 2 items under 29 CFR 1926.451 in this inspection, $2,873 in current penalties for all of them. Case closed Nov 6, 2025. Recorded by the State Plan's office.

    Inspection activity number 348222530 in the Department of Labor data; industry: Building Finishing Contractors.

  • Oct 1, 2025 · AQUA PLUMBING SERVICE & REPAIR, LLC in Las Vegas

    1926.451(c)(2)(iv), serious, $1,709 current penalty ($3,417 as first proposed). Case closed Oct 16, 2025. Recorded by the State Plan's office.

    Inspection activity number 348346446 in the Department of Labor data; industry: Other Fabricated Metal Product Manufacturing.

  • Jul 2, 2025 · TEDESCO PACIFIC CONSTRUCTION, INC. in Sparks

    1926.451(f)(3), other-than-serious, no penalty. Case closed Aug 15, 2025. Recorded by the State Plan's office.

    Inspection activity number 347967697 in the Department of Labor data; industry: Foundation, Structure, and Building Exterior Contractors.

  • Jul 2, 2025 · WEST COAST SACKING, INC. in Sparks

    1926.451(f)(3), other-than-serious, no penalty. Case still open in the data extracted Oct 21, 2026. Recorded by the State Plan's office.

    Inspection activity number 347966855 in the Department of Labor data; industry: Foundation, Structure, and Building Exterior Contractors.

  • May 8, 2025 · An employer in other specialty trade contractors in Las Vegas

    1926.451(b)(1), serious, $4,138 current penalty ($8,276 as first proposed); 4 items under 29 CFR 1926.451 in this inspection, $15,724 in current penalties for all of them. Case closed Aug 6, 2025. Recorded by the State Plan's office.

    Inspection activity number 348189754 in the Department of Labor data; industry: Other Specialty Trade Contractors.

  • May 8, 2025 · NEVADA DEPARTMENT OF HEALTH & HUMAN SERVICES, DIVISION OF CHILD & FAMILY SERVICES in Caliente

    1926.451(g)(4), serious, $1,508 current penalty ($3,015 as first proposed). Case closed Aug 8, 2025. Recorded by the State Plan's office.

    Inspection activity number 348012717 in the Department of Labor data; industry: Individual and Family Services.

  • Mar 14, 2025 · T.B. PENICK & SONS, INC. in Las Vegas

    1926.451(f)(3), other-than-serious, $384 penalty. Case closed Apr 29, 2025. Recorded by the State Plan's office.

    Inspection activity number 347891301 in the Department of Labor data; industry: Nonresidential Building Construction.

FY2025 in Nevada, every industry

21

citation items under 29 CFR 1926.451 in 13 inspections

1

items at employers outside construction (20 at construction employers, NAICS 23)

0.7%

of the 3,222 items under 29 CFR 1926.451 in the data

From Oct 1, 2024 to Sep 30, 2025, the data record 21 citation items under 29 CFR 1926.451 at inspected sites in Nevada, in 13 inspections, every industry included. Of the 97 sections of 29 CFR parts 1904, 1910 and 1926 cited in Nevada that year (1,457 citation items in all), 16 drew more items than 29 CFR 1926.451 and 1 drew as many. By classification: 15 serious, 0 willful, 0 repeat and 6 other-than-serious. All of them were recorded by the State Plan's office. Of the 55 states, DC and territories with items under 29 CFR 1926.451 in this data, 32 had more than Nevada and 2 had as many.

Paragraphs cited in Nevada, FY2025
ParagraphItemsShare of the 21
1926.451(f)(3)943%
1926.451(b)(7)210%
1926.451(b)(1)(i)210%
1926.451(h)(1)210%
1926.451(g)(1)(vii)15%

10 different paragraphs were cited in all; the table lists the 5 with the most items.

Industry groups with the most items: Foundation, Structure, and Building Exterior Contractors (6); Building Finishing Contractors (5); Residential Building Construction (4). 77% of the 13 inspections with a recorded headcount were at sites with 1 to 10 employees (the headcount of the inspected site, not of the employer).

Quarter by quarter in Nevada

Citation items under 29 CFR 1926.451 at inspected sites in Nevada, by quarter of issuance
QuarterItems
FY2025 · Oct to Dec 20244
FY2025 · Jan to Mar 202510
FY2025 · Apr to Jun 20255
FY2025 · Jul to Sep 20252
FY2026 · Oct to Dec 20254
FY2026 · Jan to Mar 20260
FY2026 · Apr to Jun 20260
FY2026 · Jul to Sep 20262

FY2026 so far: 6 citation items, against 21 in FY2025. FY2026 is still incomplete in the data extracted Oct 21, 2026: the Department of Labor adds citations with a delay.

29 CFR 1926.451 in the states next to Nevada

Since October 1, 2024, the data record 27 citation items under 29 CFR 1926.451 in Nevada; in the states next to it, Oregon 83 (59 in FY2025), Utah 59 (23 in FY2025), Idaho 11 (9 in FY2025), Arizona 9 (7 in FY2025) and California 3 (2 in FY2025). The latest there:

  • Aug 27, 2026 · CR LIGHTING & ELECTRIC, INC. in West Point, Utah

    1926.451(f)(7), serious, $1,182 current penalty ($2,363 as first proposed). Case still open in the data extracted Oct 21, 2026. Recorded by the Utah State Plan office.

    Inspection activity number 349102145 in the Department of Labor data; industry: Building Equipment Contractors.

  • Aug 21, 2026 · An employer in foundation, structure, and building exterior contractors in Oregon City, Oregon

    1926.451(g)(1)(vii), serious, $4,251 penalty; 3 items under 29 CFR 1926.451 in this inspection, $4,251 in current penalties for all of them. Case still open in the data extracted Oct 21, 2026. Recorded by the Oregon State Plan office.

    Inspection activity number 348985912 in the Department of Labor data; industry: Foundation, Structure, and Building Exterior Contractors.

  • Jul 29, 2026 · LAKE OSWEGO DRYWALL AND CONSTRUCTION INC in Newberg, Oregon

    1926.451(f)(15), serious, $3,644 penalty; 2 items under 29 CFR 1926.451 in this inspection, $5,466 in current penalties for all of them. Case still open in the data extracted Oct 21, 2026. Recorded by the Oregon State Plan office.

    Inspection activity number 349059600 in the Department of Labor data; industry: Building Finishing Contractors.

From the Department of Labor's OSHA enforcement data, extracted Oct 21, 2026: deleted items left out, 29 CFR numbers only, placed in the state of the inspected site; establishment names as recorded, shown when they name a business or a public body; penalties as recorded on Oct 28, 2026, and they change when a case is settled or contested. A State Plan office can record an item under a state rule number instead of 29 CFR 1926.451; only items recorded under the federal number appear here. These are not figures OSHA publishes for the state, and the live database can change them. Same data source and method as our HazCom enforcement study.

What Nevada's own rule says

“the general contractor of a construction project or, if there is no general contractor, the owner, shall install an elevator or personnel hoist for transporting workers for each building or structure of the construction project which is more than 60 feet above ground level or more than 48 feet below ground level.”

The hoist duty applies at project level and does not change what 1926.451 requires of a scaffold. On a Nevada construction project as the regulation defines it (ten million dollars or more, or 50,000 square feet, or more than 60 feet above or 48 feet below ground) the general contractor must install an elevator or personnel hoist to move workers on any structure past those depths and heights. There is no federal equivalent. The codified dollar threshold is ten million dollars; a proposal to raise it to twenty million was not adopted. Nevada also requires written notice to the Chief of the Enforcement Section before construction starts, stating height, square footage, type, total cost and location, and the Chief may then require meetings with the contractor or owner.

NAC 618.507, with the construction project definition at NAC 618.494The federal standard is unchanged; the state rule quoted is a neighboring rule.

Read in Nevada Occupational Safety and Health Administration (NV OSHA)'s own rule text · verified 2026-04-13

How Nevada Enforces 29 CFR 1926.451

Nevada runs an OSHA-approved State Plan administered by Nevada Occupational Safety and Health Administration (NV OSHA), which ordinarily covers private-sector construction (a few workplaces, such as some federal enclaves, military installations and maritime work, stay under federal OSHA, as the Coverage section of OSHA's page on the plan lists). Its compliance officers enforce Nevada's own standards, which must be at least as effective as federal OSHA's and may go further. On this subject the rule is NAC 618.507, with the construction project definition at NAC 618.494. Nevada Occupational Safety and Health Administration (NV OSHA) cited 29 CFR 1926.451 20 times in Nevada construction in FY2025 (OSHA Frequently Cited Standards). Nevada applies the federal penalty maximums.

In Nevada, the FY2025 citations under 29 CFR 1926.451 went most often to Drywall and Insulation Contractors (5) and New Single-Family Housing Construction (except For-Sale Builders) (4). Citing instances separately is a discretionary exception: OSHA's instance-by-instance policy of April 17, 2024 allows it for serious or repeat violations, and other-than-serious recordkeeping violations, where the standard's text allows it.

HazComFast records the state of every jobsite and shows that the Nevada State Plan ordinarily governs it; a location in the state does not settle the exclusions listed in the Coverage section of OSHA's page on the plan. Start free

Help and oversight in Nevada

Free, confidential help: OSHA On-Site Consultation

In Nevada, the program is Safety, Consultation & Training Section (Department of Business & Industry - Division of Industrial Relations). OSHA describes it as “Primarily for smaller businesses, no-cost, confidential consultations help employers identify and address hazards and establish or improve safety and health programs.” It is separate from OSHA enforcement; the employer commits to correcting serious hazards.

Nevada consultation program · OSHA consultation directory

Sources: osha.gov and the state's official statute site, September 26, 2026.

Nevada Penalty Amounts for 29 CFR 1926.451 (2026)

Reviewed · 2026-10-19

Federal amounts effective January 15, 2025 (29 CFR 1903.15(d)).

Violation type2026 maximumBasis
Serious$16,550Federal max · 29 CFR 1903.15(d)
Willful$165,514Federal max · 29 CFR 1903.15(d)
Repeat$165,514Federal max · 29 CFR 1903.15(d)
Failure to abate$16,550/dayup to $16,550 per day; the total is normally capped at 30 times the daily amount (FOM Ch.6)

Nevada applies the federal OSHA maximums. Amounts are ceilings per violation. Nevada Occupational Safety and Health Administration (NV OSHA) computes proposed penalties under its own State Plan procedures.

Key Scaffolding Requirements 29 CFR 1926.451

  • Each scaffold and scaffold component supports, without failure, its own weight and at least 4 times the maximum intended load, except as provided in (a)(2)-(a)(5) and (g) (1926.451(a)(1))
  • Provide fall protection for each employee on a scaffold more than 10 feet above a lower level, with the system (g)(1)(i)-(vii) sets for the scaffold type: personal fall arrest, guardrails, or both
  • A competent person inspects scaffolds and scaffold components for visible defects before each work shift and after any occurrence which could affect structural integrity (1926.451(f)(3))
  • Train each employee who performs work on a scaffold (1926.454)
  • Provide access by ladder, stair tower, ramp, walkway, integral prefabricated scaffold access or similar means when platforms are more than 2 feet above or below a point of access; crossbraces are not used as a means of access (1926.451(e)(1))
  • Follow the requirements specific to the scaffold type (1926.452)

Who enforces it in Nevada: Nevada Occupational Safety and Health Administration (NV OSHA) inspects private employers, construction included, under an OSHA-approved State Plan. Nevada's own rule on this subject is NAC 618.507, with the construction project definition at NAC 618.494.

The compliance checklist, the paragraphs OSHA cites nationally and what an inspector checks under 29 CFR 1926.451 are on the 29 CFR 1926.451 page.

Most-Cited Scaffolding Paragraphs in Nevada, FY2025

Nevada Occupational Safety and Health Administration (NV OSHA) issued 20 citations under 29 CFR 1926.451 to Nevada construction employers in FY2025. The paragraphs cited most, with the official text. A serious violation carries up to $16,550.

  • 1

    1926.451(f)(3) 9 citations

    “Scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural …”

  • 2

    1926.451(b)(1)(i) 2 citations

    “Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the …”

  • 3

    1926.451(b)(7) 2 citations

    “On scaffolds where platforms are overlapped to create a long platform, the overlap shall occur only over supports, and shall not be less than 12 inches (30 cm) …”

  • 4

    1926.451(h)(1) 2 citations

    “In addition to wearing hardhats each employee on a scaffold shall be provided with additional protection from falling hand tools, debris, and other small objects through the installation …”

  • 5

    1926.451(b)(1) 1 citation

    “Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:”

  • 6

    1926.451(c)(2) 1 citation

    “Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.”

HazComFast count from the Labor Department's OSHA enforcement data: citations issued in FY2025 to construction employers (NAICS 23), by the paragraph cited. Paragraph text: eCFR, current as of September 24, 2026. data.dol.gov

Nevada Safety & Enforcement Profile

319

FY2025 construction citations

Nevada Occupational Safety and Health Administration (NV OSHA)

Enforces private construction

  • Construction trades inspected most in Nevada, FY2025: Commercial and Institutional Building Construction (69), Roofing Contractors (36) and Site Preparation Contractors (28), out of 378 inspections opened (federal OSHA and State Plan combined).
  • Cited most under 29 CFR 1926.451 in Nevada, FY2025: Drywall and Insulation Contractors (5), New Single-Family Housing Construction (except For-Sale Builders) (4) and Masonry Contractors (4), of 20 citations.
  • Construction fatality rate in Nevada, 2024: 7.9 per 100,000 full-time workers, 28th highest of the 40 states BLS published (all industries: 2.3).

HazComFast count from the Labor Department's OSHA enforcement data: inspections of construction employers (NAICS 23) opened from October 1, 2024 to September 30, 2025, federal OSHA and State Plan combined, grouped by the inspected employer's 2022 NAICS industry. HazComFast count from the Labor Department's OSHA enforcement data: citations issued in FY2025 to construction employers (NAICS 23), grouped by the cited employer's 2022 NAICS industry. Industry names are the Census Bureau's 2022 NAICS titles. data.dol.gov · BLS fatality rates by state, 2024

Scaffolding FAQ for Nevada

Which Nevada construction trades are cited most under Scaffolding?

In FY2025, Nevada Occupational Safety and Health Administration (NV OSHA) issued 20 citations under 29 CFR 1926.451 to Nevada construction employers, most often to Drywall and Insulation Contractors (5), New Single-Family Housing Construction (except For-Sale Builders) (4) and Masonry Contractors (4) (HazComFast count from Labor Department enforcement data, by the cited employer's NAICS industry). Nevada Occupational Safety and Health Administration (NV OSHA) inspects these employers directly and may apply requirements beyond the federal standard. For context, Nevada Occupational Safety and Health Administration (NV OSHA) issued 319 construction citations across 170 inspections in FY2025. On a jobsite, the standard on this subject is 29 CFR 1926.451.

How often is Scaffolding cited on Nevada jobsites?

In FY2025, Nevada's state plan (Nevada Occupational Safety and Health Administration (NV OSHA)) issued 319 construction citations across 170 inspections (OSHA Frequently Cited Standards, NAICS 23). Nevada's fatality figures are shown above.

Who enforces scaffolding rules (1926.451) on Nevada construction sites?

Nevada OSHA, the state program within the Division of Industrial Relations. Nevada runs a full OSHA-approved State Plan, so a state compliance officer inspects and cites 29 CFR 1926.451, 20 times in FY2025 construction.

Can I get free OSHA help in Nevada without an inspection?

Yes. OSHA's On-Site Consultation Program in Nevada is Safety, Consultation & Training Section (Department of Business & Industry - Division of Industrial Relations). OSHA describes it this way: "Primarily for smaller businesses, no-cost, confidential consultations help employers identify and address hazards and establish or improve safety and health programs." Consultations are separate from OSHA enforcement, and the employer commits to correcting serious hazards.

How often does Nevada cite 29 CFR 1926.451 in construction?

In FY2025, Nevada Occupational Safety and Health Administration (NV OSHA) cited 29 CFR 1926.451 (Scaffolding) 20 times on Nevada construction jobsites, with $81,971 in penalties for that standard alone (current amounts), about 6.3% of the 319 construction citations the state issued that year. (Source: OSHA Frequently Cited Standards, NAICS 23; verified 2026-08-08.)

Scaffolding Guides & Resources

Want the complete federal guide for this standard?

Compare this combination against any other state and standard with the enforcement risk lookup.

Sources & verification

Penalty amounts and plan-type data were checked on 2026-10-19 against eCFR, OSHA.gov, and the Federal Register. This page is informational and not legal advice; consult the enforcing agency or counsel for your specific situation.

Get the Binder in Order Before the Inspector Arrives. Are You Ready?

OSHA inspections come unannounced, apart from the few exceptions listed in 29 CFR 1903.6. Get the binder in order before the opening conference, not during it.

Serious Violation

$16,550

per violation (max)

HazComFast Pro

$199/mo

10 jobsites, unlimited chemicals, unlimited workers

New sign-ups are paused. The free tools below need no account, and customers can log in as usual.

Your account keeps working as usual. Cancel anytime.