Construction (29 CFR 1926)

General Requirements for Storage (Construction)

Verified vs OSHA sources · 2026-10-19

29 CFR 1926.250

29 CFR 1926.250 sets the general requirements for storing, handling, and disposing of materials on construction sites: materials stored in tiers must be stacked, racked, blocked, interlocked, or otherwise secured to prevent sliding, falling, or collapse, aisles and passageways must be kept clear, and the weight of stored materials on floors within buildings and structures does not exceed the maximum safe load limits, which are conspicuously posted in pounds per square foot in all storage areas, with the exceptions of 1926.250(a)(2)(ii). The exceptions do not dispense with the maximum safe load limits.

29 CFR 1926.250 at a glance

What it requires
Construction materials secured against collapse, clear aisles, and observed floor load limits
Who it covers
Construction employers storing and handling materials
Stacking rule
Materials stored in tiers must be secured to prevent sliding, falling, or collapse (1926.250(a)(1))
Key duty
Stack and secure materials, keep aisles clear, and respect posted floor load limits
Max penalty (2026)
$16,550 per serious violation; $165,514 per willful
Common confusion
(a)(1) allows stacking, racking, blocking, interlocking or otherwise securing; the exceptions to the posting of load limits do not dispense with the maximum safe load limits

What 29 CFR 1926.250 requires (plain English)

29 CFR 1926.250 sets the general requirements for the storage, handling, and disposal of materials on construction sites.

Materials stored in tiers must be stacked, racked, blocked, interlocked, or otherwise secured to prevent sliding, falling, or collapse. Aisles and passageways must be kept clear and in good repair to provide safe travel and material handling. The weight of stored materials on floors and structures must not exceed the maximum safe load limits, which must be posted in pounds per square foot in storage areas on floors within buildings and structures (not required on a floor or slab on grade, or in single-family and wood-framed multi-family residential structures, 1926.250(a)(2)(ii)). Inside buildings under construction, materials may not be placed within 6 feet of a hoistway or inside floor openings, or within 10 feet of an exterior wall that does not extend above the top of the material (1926.250(b)(1)); brick stacks may not exceed 7 feet and loose brick tapers back above 4 feet; masonry blocks taper back above 6 feet; lumber stacks may not exceed 20 feet (16 feet if handled manually) ((b)(6)-(8)). Materials near an excavation fall under the excavation standard instead: 1926.651(j)(2) requires excavated or other materials and equipment that could fall or roll into the excavation to be kept at least 2 feet from its edge, held back by retaining devices, or both; the 6 and 10 feet of 1926.250(b)(1) do not apply to an excavation. When a difference in road or working levels exists, means such as ramps, blocking or grading are used to ensure the safe movement of vehicles between the two levels ((a)(4)). The other storage paragraphs add segregation of noncompatible materials ((b)(3)), no storage on scaffolds or runways beyond supplies needed for immediate operations ((b)(5)), stacking and blocking of structural steel, poles, pipe, bar stock and other cylindrical materials unless racked ((b)(9)), fall arrest for employees working on stored material in silos, hoppers and tanks ((b)(2)), and housekeeping ((c)); dockboards have their own provisions ((d)). The disposal of materials is in 1926.252, not covered fully by 1926.250. The 2019 final rule (84 FR 21577, May 14, 2019) is the origin of the exceptions to the posting of floor load limits ((a)(2)(ii)); the current requirements have changed since the first rules.

1910.176 does not state a universal posting of floor loads; it is comparable with 1926.250 only for stability and aisles.

The regulatory text

“All materials stored in tiers shall be stacked, racked, blocked, interlocked, or otherwise secured to prevent sliding, falling or collapse.”
29 CFR 1926.250(a)(1)

Key facts about 29 CFR 1926.250

  • Materials stored in tiers must be secured to prevent sliding, falling, or collapse (1926.250(a)(1)).
  • Aisles and passageways must be kept clear and in good repair.
  • Floor and structure load limits must not be exceeded (1926.250(a)(2)(i)), and the maximum safe load must be posted in pounds per square foot in storage areas on floors within buildings and structures, except on a floor or slab on grade and in single-family and wood-framed multi-family residential structures ((a)(2)(ii)).
  • Inside a building under construction, no storage within 6 feet of a hoistway or inside a floor opening, or within 10 feet of an exterior wall that does not extend above the material (1926.250(b)(1)).
  • Specific rules: bagged materials stepped back and cross-keyed every 10 bags; brick stacks 7 feet or less, tapered back 2 inches per foot above 4 feet; masonry blocks tapered back above 6 feet; lumber piles 20 feet or less (16 feet if handled manually) (1926.250(b)(4), (6)-(8)).
  • When a difference in road or working levels exists, means such as ramps, blocking or grading ensure the safe movement of vehicles between the two levels (1926.250(a)(4)).
  • Disposal of materials is in 1926.252; 1926.250 does not cover it fully.

Scope: who 29 CFR 1926.250 applies to

Regulatory framework
Construction (29 CFR 1926)
Citation reference
29 CFR 1926.250
Enforcement status
In force and enforced
Jurisdiction
Federal OSHA (29 State-Plan jurisdictions may be stricter)

State-Plan states (e.g. California, Washington, Michigan) operate OSHA-approved programs that must be at least as effective as federal OSHA and frequently impose higher penalties or additional requirements.

Key requirements of 29 CFR 1926.250

#What the section requires or covers
1Stack materials to prevent sliding, falling, or collapse
2Keep storage areas free from accumulation of materials that create hazards
3Store materials clear of hoistway
4Post maximum load limits for temporary storage areas
5Remove protruding nails from lumber

Summarized from the text of 29 CFR 1926.250.

Common Materials Storage (Construction) violations

Deficiencies OSHA cites under 29 CFR 1926.250 include the ones below, in no particular order. Each serious item carries up to $16,550 (2026).

  • Materials stored in tiers not secured against sliding, falling, or collapse (1926.250(a)(1)).
  • Aisles and passageways blocked or not kept clear (1926.250(a)(3)).
  • Floor or structure loaded beyond safe limits, or limits not posted where posting is required (1926.250(a)(2)).
  • Materials inside a building under construction within 6 feet of a hoistway or inside a floor opening, or within 10 feet of an exterior wall that does not extend above the stack (1926.250(b)(1)); materials near an excavation edge fall under 1926.651(j)(2) (2 feet or retaining devices).
  • Improper stacking: bags not stepped back and cross-keyed every 10 bags ((b)(4)), brick stack over 7 feet or loose brick not tapered back 2 inches per foot above 4 feet ((b)(6)), blocks over 6 feet not tapered back one-half block per tier ((b)(7)), lumber on unlevel or unsound sills, with nails left in used lumber, unstable, or piled over 20 feet (16 feet if handled manually) ((b)(8)), cylindrical materials not racked or blocked to prevent spreading or tilting ((b)(9)); noncompatible materials not segregated ((b)(3)); more material on a scaffold or runway than immediate operations need ((b)(5)).

Securing tiers and posting load limits

1926.250(a)(1) has all materials stored in tiers stacked, racked, blocked, interlocked, or otherwise secured to prevent sliding, falling or collapse; the paragraph allows racking and other securing, and the height alone does not establish instability. 1926.250(a)(2)(i) has the weight of stored materials on floors within buildings and structures not exceed maximum safe load limits; (a)(2)(ii) has the limits conspicuously posted in all storage areas, except when the storage area is on a floor or slab on grade, and posting is not required in all single-family residential structures and wood-framed multi-family residential structures. These exceptions to the posting do not dispense with the maximum safe load limits. The word "temporary" is not a criterion of the text.

What OSHA inspectors look for

A compliance officer looks for unstable or unsecured material stacks, materials stored too close to edges or in aisles, blocked passageways, and floors loaded beyond their posted limits. Material stacks are not assumed unstable from their height alone.

Example: how a violation is cited

Hypothetical case: masonry block stored in tiers without being stacked, racked, blocked, interlocked or otherwise secured. 1926.250(a)(1) has materials stored in tiers secured to prevent sliding, falling or collapse. A serious violation carries a penalty of up to $16,550.

Illustrative example, not a specific OSHA case.

Materials Storage (Construction) compliance checklist

Each item is a requirement of 29 CFR 1926.250 that OSHA may verify during an inspection.

  • Stack, rack, block, or interlock materials stored in tiers so they cannot slide, fall, or collapse.
  • Keep aisles and passageways clear and in good repair for safe travel and handling.
  • Observe the maximum safe floor and structure load limits and post them in pounds per square foot where 1926.250(a)(2)(ii) requires it.
  • Keep materials 6 feet from hoistways and out of floor openings, and 10 feet from an exterior wall that does not extend above the stack, inside buildings under construction.
  • Respect the limits for each kind of pile: bags (step back, cross-key every 10 bags high), brick (7 feet maximum, taper 2 inches per foot above 4 feet), masonry block (taper one-half block per tier above 6 feet), lumber (level, solid sills; nails withdrawn from used lumber; 20 feet maximum, 16 feet if handled manually), structural steel, poles, pipe and bar stock (racked, or stacked and blocked to prevent spreading or tilting) (1926.250(b)(4)-(9)).
  • Segregate noncompatible materials ((b)(3)), keep scaffolds and runways free of storage beyond immediate needs ((b)(5)), give personal fall arrest equipment to anyone working on stored material in silos, hoppers or tanks ((b)(2)), and keep storage areas free of tripping, fire, explosion and pest hazards ((c)).
  • Apply 1926.251 (rigging) and Subpart CC (cranes) when moving stored materials.

2026 penalties for 29 CFR 1926.250

Maximums set by 29 CFR 1903.15(d). 2026 maximums unchanged from 2025 (no CPI adjustment; OMB M-26-11), so not an increase; the serious and repeat policy minimums were revised with FOM chapter 6 (OSHA memo of May 21, 2026). The 2025 OSHA penalty levels remain in effect for 2026; OSHA made no inflation adjustment for 2026. 29 CFR 1903.15 identifies January 15, 2025 as the effective reference for these amounts, while OSHA's public penalties page currently references penalties assessed after Jan. 15, 2026.

Violation typeMinimumMaximumWhen it applies
Serious$1,085$16,550Death or serious physical harm could result, and the employer knew or could have known (29 U.S.C. 666(k)).
Other-Than-Serious$0$16,550Relates to safety/health but unlikely to cause death or serious harm.
Willful$11,823$165,514Intentional, knowing, or voluntary disregard of the requirement.
Repeated$4,256$165,514A substantially similar violation cited within the last 5 years.
Failure to AbateNone$16,550/dayup to $16,550 per day; the total is normally capped at 30 times the daily amount (FOM Ch.6)

Serious violations reach $16,550 and willful or repeat violations $165,514.

Maximums and the willful minimum are set by 29 CFR 1903.15(d); the serious and repeated minimums are OSHA policy floors from its annual penalty adjustment memo. OSHA applies gravity-based and size, good-faith and history reductions (FOM CPL 02-00-164 Ch.6). Estimates only, not legal advice.

The business case for Materials Storage (Construction) compliance

1926.250(a)(1) has all materials stored in tiers stacked, racked, blocked, interlocked, or otherwise secured to prevent sliding, falling or collapse; (a)(2) has the weight of stored materials on floors within buildings and structures not exceed maximum safe load limits, conspicuously posted, with exceptions; (a)(3) has aisles and passageways kept clear.

State plans and their penalty rules

States listed by the volume of their federal construction citations, not by this standard. Penalties and enforcement vary by state. State-Plan states may impose higher penalties and additional requirements beyond federal 29 CFR 1926.250.

Frequently asked questions about 29 CFR 1926.250

How must construction materials be stored?

Under 1926.250(a)(1), all materials stored in tiers must be stacked, racked, blocked, interlocked, or otherwise secured to prevent sliding, falling, or collapse. In addition, aisles and passageways must be kept clear, floor load limits must be observed and posted, and inside buildings under construction materials may not be placed within 6 feet of a hoistway or inside floor openings, or within 10 feet of an exterior wall that does not extend above the stored material.

Do floor load limits have to be posted on a construction site?

Posting is required for storage areas on floors within buildings and structures, with exceptions. Under 1926.250(a)(2), the weight of stored materials must not exceed the maximum safe load of the floor or structure, and the maximum safe load limits must be posted in pounds per square foot in the storage areas, except where the storage area is on a floor or slab on grade and in single-family and wood-framed multi-family residential structures.

How must materials stored in tiers be secured?

1926.250(a)(1) has materials stored in tiers stacked, racked, blocked, interlocked, or otherwise secured to prevent sliding, falling or collapse; the paragraph allows racking and other securing, and the height alone does not establish instability.

How does 1926.250 relate to general industry's 1910.176?

1926.250 is the construction storage standard and 1910.176 is the general industry materials-handling standard. 1910.176 does not state a universal posting of floor loads; the two are compared only for stability and aisles, or by citing the exact general industry provision.

Regulatory history of 29 CFR 1926.250

1926.250 is in Subpart H (Materials Handling, Storage, Use, and Disposal). Its source note lists 44 FR 8577 (February 9, 1979), 44 FR 20940 (April 6, 1979), 49 FR 18295 (April 30, 1984), 54 FR 24334 (June 7, 1989), 58 FR 35173 (June 30, 1993), 59 FR 40729 (August 9, 1994), 61 FR 5510 (February 13, 1996) and 84 FR 21577 (May 14, 2019). The 2019 amendment of (a)(2) is the origin of the exceptions to the posting of floor load limits.

Related glossary terms

Key terms that appear in 29 CFR 1926.250, each with a full plain-English explainer.

Get the Binder in Order Before the Inspector Arrives. Are You Ready?

OSHA inspections come unannounced, apart from the few exceptions listed in 29 CFR 1903.6. Get the binder in order before the opening conference, not during it.

Serious Violation

$16,550

per violation (max)

HazComFast Pro

$199/mo

10 jobsites, unlimited chemicals, unlimited workers

New sign-ups are paused. The free tools below need no account, and customers can log in as usual.

Your account keeps working as usual. Cancel anytime.