Skip to content

Urgent: Nov 20, 2026 — HCS 2024 Deadline. Get ready →

Heat, cold and stormsAbout 5 minutesNOAA guidance · site emergency plan

Tornado and Severe Weather Toolbox Talk

A short talk on tornadoes and severe storms: what a watch and a warning mean, how the crew gets the alert, where the shelter is, how visitors and subcontractors are counted, and what gets inspected before work starts again. NOAA's National Weather Service issues the watches and warnings; the site's emergency plan says what the crew does.

All safety topics

At a glance

  • No OSHA standard is written for tornadoes alone. NOAA National Weather Service alerts; emergency action plan elements in 29 CFR 1910.38(c) where a standard requires a plan; General Duty Clause, 29 U.S.C. 654(a)(1).
  • About 5 minutes to read the script out loud, then the three questions. The drill and the tables below add time if you use them.
  • Free PDF and Word file: the script, the questions, the rule and a 20-line sign-in sheet. No account, no email.

Read this to your crew

Today is tornadoes and severe storms. The National Weather Service uses two words that mean different things. A tornado watch means tornadoes are possible in and near the area: get ready. A tornado warning means a tornado has been sighted or indicated by weather radar: take shelter now.

Before work, the supervisor names how the crew will hear a warning, for example a NOAA Weather Radio, phone alerts and an air horn signal. Whoever hears a warning sounds the site signal.

The shelter is chosen ahead of time: an interior room on the lowest floor of a sturdy building, away from windows, not a large open room. The National Weather Service says sheds and storage facilities are not safe, and neither is a mobile home, a tent or a vehicle. That is different from lightning, where a hard-topped vehicle is a shelter.

When the warning comes, everyone goes, visitors, delivery drivers and subcontractors too. Equipment stops where it is if that can be done safely. At the shelter we count heads against the sign-in sheet and the subcontractors' crew lists, and anyone missing is reported by name and last location. Nobody walks back out into the storm to search.

After the storm, the end of an alert does not mean the site is safe. A competent person inspects scaffolds after any occurrence that could affect their structural integrity, and excavations after every rainstorm or other hazard-increasing occurrence. Work starts again only where the site has been checked.

Three questions for the crew

  1. What is the difference between a tornado watch and a tornado warning?
    Listen for: Watch: tornadoes are possible, get ready. Warning: a tornado has been sighted or indicated on radar, take shelter now.
  2. Where is our shelter, and how do visitors and subcontractors know about it?
    Listen for: A named sturdy building, lowest floor, interior room away from windows, and a plan to bring everyone on site there with the sign-in records.
  3. Someone is missing at the head count. What do we do?
    Listen for: Report the name and last known location to the supervisor and to 911; nobody goes back out into the storm to search.

Is there an OSHA rule for tornadoes?

No OSHA standard is written for tornadoes alone. Each employer furnishes employment and a place of employment free from recognized hazards that are causing or are likely to cause death or serious physical harm (29 U.S.C. 654(a)(1)).

Where an OSHA standard requires an emergency action plan, its minimum elements include procedures for reporting an emergency, for evacuation, for accounting for all employees after evacuation, and for employees performing rescue or medical duties (29 CFR 1910.38(c)); in construction, 29 CFR 1926.35 applies to the plans other standards require. A site's plan can include its severe weather procedures.

After a storm, scaffolds and scaffold components shall be inspected for visible defects by a competent person after any occurrence which could affect a scaffold's structural integrity (29 CFR 1926.451(f)(3)), and excavation inspections shall also be made after every rainstorm or other hazard increasing occurrence (29 CFR 1926.651(k)(1)).

The paragraphs, word for word:

“(3) Scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity.”

29 CFR 1926.451(f)(3)

Watch, warning, and what the crew does

AlertWhat it means (National Weather Service)What the crew does
Tornado watchTornadoes are possible in and near the watch areaReview the plan, check that the alerts work, keep the shelter route clear, be ready to act
Tornado warningA tornado has been sighted or indicated by weather radarStop work, make equipment safe if there is time, everyone to the shelter, head count
Tornado emergencyThe National Weather Service's highest alert level, issued when a violent tornado has touched downTake shelter immediately
After the stormThe alert has endedStay in the shelter until the supervisor gives the word; scaffolds and excavations inspected before anyone goes back on them

Alert definitions: NOAA National Weather Service tornado safety pages.

Drill: shelter and head count

About ten minutes, at a calm moment, walking, with equipment shut down normally first.

  1. Sound the site signal agreed for a warning.
  2. Everyone walks to the shelter, visitors and subcontractors included.
  3. Count heads against the day's sign-in sheet, the subcontractors' lists and the visitor log.
  4. Report one pretend missing person by name and last known location, the way it would go to the supervisor and to 911.
  5. Note what slowed the crew down, and name who fixes it.

Inside HazComFast

Give the severe weather talk, keep every signature

Print this talk for the morning meeting. In HazComFast, the crew signs the toolbox talk on a phone, in English or Spanish, and the record stays with each worker.

  • Signed where the signal isn't

    In a basement or a dead zone, the crew can still sign the toolbox talk in Chrome on Android or on a computer. The sign-ins go out once the app is open with a signal again, and each one lands once.
  • Sheets and certificates in Spanish

    Toolbox talk PDFs and training certificates print in Spanish, and compliance reports come out in English, Spanish or both side by side.
  • Thirty hires on a Monday morning

    Import a spreadsheet, see line by line who was created and who wasn't, and print one sheet of QR badges for the morning toolbox talk. Email is optional.
  • Records that stay when a worker leaves

    When a worker leaves, their training records and competent person designation stay on file. The account can't take them along.

New sign-ups are paused · the free tools need no account

Questions about this talk

What is the difference between a tornado watch and a tornado warning?

The National Weather Service issues a tornado watch when tornadoes are possible in and near the watch area, and a tornado warning when a tornado has been sighted or indicated by weather radar. A warning means take shelter now.

Is a vehicle or a shed safe in a tornado?

No. The National Weather Service says being in a vehicle during a tornado is not safe, and that sheds and storage facilities are not safe, nor is a mobile home or a tent. At work, it says to follow your tornado drill and go to your tornado shelter location, away from windows and large open rooms.

Does OSHA require a tornado plan?

No OSHA standard is written for tornadoes alone. Where a standard requires an emergency action plan, 29 CFR 1910.38(c) lists its minimum elements, and 29 CFR 1926.35 applies in construction; the General Duty Clause covers recognized hazards (29 U.S.C. 654(a)(1)).

When can work resume after a tornado warning?

After the alert ends and the site has been checked. In construction, scaffolds are inspected by a competent person after any occurrence which could affect their structural integrity (29 CFR 1926.451(f)(3)), and excavations after every rainstorm or other hazard increasing occurrence (29 CFR 1926.651(k)(1)).

How do we account for subcontractors and visitors?

With the records of the day: the site sign-in, the subcontractors' crew lists and the visitor log, counted at the shelter.

Does OSHA require toolbox talks?

No rule requires a talk by that name. Construction employers must instruct each employee in the recognition and avoidance of unsafe conditions (29 CFR 1926.21(b)(2)), and many standards carry their own training duty; a toolbox talk is a common way to deliver part of it.

Do we need a sign-in sheet for a toolbox talk?

No general OSHA rule requires attendance records for a toolbox talk. Some standards require written certification of training, such as fall protection (29 CFR 1926.503(b)(1)) and forklift operators (29 CFR 1910.178(l)(6)). A signed sheet shows who attended; keep the topic, the date, the presenter and the language with it. It does not show that the content was understood.

Go further

More talks on heat, cold and storms

Sources

In a State Plan state, the state's own standard applies, and it can be stricter than the federal rule. Not legal advice.

All safety topics 100 safety topics Safety tip of the day