Exposure & Health Toolbox
Estimate and control exposures: silica 8-hour TWA, Table 1 control selection, noise dose/TWA, and PPE review using the supplier SDS, task and exposure assessment; pictograms alone do not determine the protection needed.
What this covers
Health standards work by comparing a worker's time-weighted exposure to a permissible exposure limit (PEL) and an action level that triggers monitoring and controls. Respirable crystalline silica has a PEL of 50 µg/m³ as an 8-hour TWA (action level 25); occupational noise has a 90 dBA PEL with an 85 dBA action level that triggers a hearing conservation program. This pack quantifies silica and noise, picks a Table 1 control, and selects PPE.
Use these tools in order
Each tool is free, with no login. Work top to bottom; each output is a draft to check against the rule and your site.
- 1
silica-exposure-calculator
Turn your silica air-sample results into an 8-hour TWA by task. Compare vs OSHA PEL & Action Level.
- 2
silica-table-1-control-selector
Pick a construction task to get the required Table 1 dust controls and minimum respirator under 29 CFR 1926.1153.
- 3
noise-exposure-calculator
Calculate 8-hour TWA noise exposure. Compare to OSHA PEL (90 dBA) and Action Level (85 dBA).
- 4
ppe-selector
Select GHS pictograms to get instant PPE recommendations. Eye, hand, respiratory & body protection.
Frequently asked questions
What is the OSHA silica PEL?
For respirable crystalline silica, 50 micrograms per cubic meter of air as an 8-hour time-weighted average (1926.1153(d)(1)). The action level is 25 µg/m³ (1926.1153(a)); under the scheduled monitoring option, a result between the action level and the PEL calls for repeat monitoring within six months (1926.1153(d)(2)(iii)(C)) and a result above the PEL within three months (1926.1153(d)(2)(iii)(D)). On a construction site medical surveillance has its own trigger: required respirator use for 30 or more days a year.
What noise level triggers a hearing conservation program?
In general industry, an 8-hour TWA of 85 dBA (the action level, 1910.95(c)). The PEL is 90 dBA; at or above the action level you must provide monitoring, hearing protection, audiometric testing, and training. In construction, 1926.52 requires a hearing conservation program when exposure exceeds its Table D-2 values, without the detailed program elements of 1910.95.
Is the silica Table 1 mandatory?
No — Table 1 is an option. If you fully and properly implement the specified engineering controls, work practices, and respiratory protection for a listed task, you don't have to separately assess exposures for that task. Otherwise you must use the alternative exposure-assessment path.
Primary sources
The rules above were verified against these texts on 2026-10-27.
Planning aids only — not legal advice. Confirm every determination against the current OSHA standard and your State-Plan's rules.
Keep it all in one place
HazComFast centralizes your SDSs, labels, and training proof, and loads each jobsite's SDS onto the crew's phones.
Try HazComFast freeGet the Binder in Order Before the Inspector Arrives. Are You Ready?
OSHA inspections come unannounced, apart from the few exceptions listed in 29 CFR 1903.6. Get the binder in order before the opening conference, not during it.
Serious Violation
$16,550
per violation (max)
HazComFast Pro
$199/mo
10 jobsites, unlimited chemicals, unlimited workers
New sign-ups are paused. The free tools below need no account, and customers can log in as usual.