What this covers
High-energy and high-risk work needs documented authorization before it starts. Permit-required confined spaces need a written entry permit (1910.146; construction Subpart AA); general-industry hot work needs authorization, which 1910.252(a)(2)(iv) prefers in writing, while construction hot work (1926.352) has fire-prevention rules but no permit requirement; and lockout/tagout needs written energy-control procedures (1910.147(c)(4)) outside construction. This pack generates the entry permit, the hot-work permit with fire watch, and a machine-specific LOTO procedure.
Use these tools in order
Each tool is free, with no login. Work top to bottom; each output is a draft to check against the rule and your site.
- 1
confined-space-permit-generator
Generate a confined space entry permit with the 1926.1206 entries and atmospheric readings. Download PDF.
- 2
hot-work-permit-generator
Generate a hot work permit with fire-watch requirements and pre/post checks (1926.352 welding & cutting).
- 3
loto-procedure-generator
Generate machine-specific Lockout/Tagout procedures for 6 energy types. Download PDF.
Frequently asked questions
What makes a confined space 'permit-required'?
A confined space becomes permit-required if it contains (or could contain) a hazardous atmosphere, a material that could engulf an entrant, an internal configuration that could trap or asphyxiate, or any other recognized serious safety or health hazard.
Is a fire watch required for hot work?
In general industry, yes, wherever more than a minor fire could develop or combustibles sit within 35 feet, and it stays at least a half hour after the work ends (1910.252(a)(2)(iii)). In construction, 1926.352(e) calls for one when normal fire-prevention precautions aren't enough, kept long enough after the work that no fire can start, with no fixed time.
Does lockout/tagout need machine-specific procedures?
Procedures must be specific enough for the equipment: the steps to shut down, isolate, lock out, and verify zero energy (1910.147(c)(4)). OSHA's interpretation of January 14, 2003 lets one document cover several machines that use the same type and magnitude of energy and have the same or similar controls, as long as the steps stay clear enough to follow. A machine that meets all eight conditions of the exception in the note to 1910.147(c)(4)(i) needs no documented procedure, though energy control still applies.
Primary sources
The rules above were verified against these texts on 2026-10-27.
- 29 CFR 1910.146, Permit-required confined spaces (general industry)
- 29 CFR 1926 Subpart AA, Confined spaces in construction
- 29 CFR 1910.252, Welding, cutting and brazing (general industry)
- 29 CFR 1926.352, Fire prevention (construction)
- 29 CFR 1910.147, Control of hazardous energy
- OSHA letter of interpretation, January 14, 2003 (one procedure for similar machines)
Planning aids only — not legal advice. Confirm every determination against the current OSHA standard and your State-Plan's rules.
Keep it all in one place
HazComFast centralizes your SDSs, labels, and training proof, and loads each jobsite's SDS onto the crew's phones.
Try HazComFast freeGet the Binder in Order Before the Inspector Arrives. Are You Ready?
OSHA inspections come unannounced, apart from the few exceptions listed in 29 CFR 1903.6. Get the binder in order before the opening conference, not during it.
Serious Violation
$16,550
per violation (max)
HazComFast Pro
$199/mo
10 jobsites, unlimited chemicals, unlimited workers
New sign-ups are paused. The free tools below need no account, and customers can log in as usual.
Your account keeps working as usual. Cancel anytime.