Skip to content

Approaching: Feb 1, 2027 — 300A Posting Begins. Get ready →

Tag

Lockout Tagout

5 OSHA and HazCom articles tagged "Lockout Tagout" — practical, CFR-cited guidance you can check at the source.

Does OSHA require a written lockout/tagout procedure for every machine? - Compliance article thumbnail
Compliance

Does OSHA require a written lockout/tagout procedure for every machine?

No. Federal OSHA's 29 CFR 1910.147(c)(4) requires energy control procedures that are developed, documented and utilized, and it doesn't say how many machines one procedure may cover. OSHA's enforcement directive lets similar machines share one procedure when they're listed in its scope and have the same or similar shutdown, device and verification steps. In California, 8 CCR §3314(g)(2)(A) starts from separate steps for each machine.

Nov 6, 2026
14 min read
Can a Lockout Be Removed Without the Verifications? - Safety article thumbnail
Safety

Can a Lockout Be Removed Without the Verifications?

A lockout removal saved with both verification boxes unchecked. A permit closed with no fire watch sign-off. Your compliance software just generated, timestamped, and preserved a signed record of the thing you didn't do, and it will export it beautifully for the inspector. The failure mode nobody audits for, and the test that finds it.

Aug 27, 2026
8 min read
Does OSHA Lockout/Tagout (1910.147) Apply to Construction? The Surprising Answer - Construction article thumbnail
Construction

Does OSHA Lockout/Tagout (1910.147) Apply to Construction? The Surprising Answer

No. 29 CFR 1910.147 expressly excludes construction at 1910.147(a)(1)(ii). Construction hazardous-energy control instead runs on 1926.417, 1926.702(j), Subpart V, 1926.20/.21, and the General Duty Clause. This is how to build the right program.

Jun 25, 2026
13 min read
Lockout/Tagout (LOTO) Complete Guide: Energy Control for General Industry & Construction - Safety article thumbnail
Safety

Lockout/Tagout (LOTO) Complete Guide: Energy Control for General Industry & Construction

A complete guide to lockout/tagout under 29 CFR 1910.147, and what carries over to construction, where 1926.417 applies instead. Covers 6 energy types, group LOTO, periodic inspections, and the citation traps. Includes a free LOTO Procedure Generator.

Mar 9, 2026
17 min read
Near Miss Reporting, JHA & LOTO: Proactive Safety That Prevents Incidents - Safety Tips article thumbnail
Safety Tips

Near Miss Reporting, JHA & LOTO: Proactive Safety That Prevents Incidents

How near miss reporting, Job Hazard Analysis, and Lockout/Tagout programs work together to prevent construction injuries before they happen.

Mar 7, 2026
9 min read