
Group Lockout Tagout and Shift Changes: Maintaining Every Worker's Protection
Develop group lockout and shift-change procedures that preserve personal protection, coordinate contractors, verify isolation and control testing and restart.

Does OSHA require a written lockout/tagout procedure for every machine?
No. Federal OSHA's 29 CFR 1910.147(c)(4) requires energy control procedures that are developed, documented and utilized, and it doesn't say how many machines one procedure may cover. OSHA's enforcement directive lets similar machines share one procedure when they're listed in its scope and have the same or similar shutdown, device and verification steps. In California, 8 CCR §3314(g)(2)(A) starts from separate steps for each machine.

Does OSHA Lockout/Tagout (1910.147) Apply to Construction? The Surprising Answer
No. 29 CFR 1910.147 expressly excludes construction at 1910.147(a)(1)(ii). Construction hazardous-energy control instead runs on 1926.417, 1926.702(j), Subpart V, 1926.20/.21, and the General Duty Clause. This is how to build the right program.